๐Ÿ›ข๏ธ Clearwater J 42-3024H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43094 ยท Generated 2026-08-22 02:50

API
3306105706
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 U-turn horizontal well with portion of wellbore closer than 500 feet to spacing unit boundary, requiring prior approval of fracture stimulation procedures and as-built survey
๐Ÿ“„ Page 2 of 11, Conditions of Approval
Indicates complex well geometry requiring special regulatory compliance and pre-approval of completion procedures
2026-07-07 Directional Drilling
Tier 3 EOG acknowledges they will NOT complete the curved section of lateral closer than 500' FNL setback (22,260' MD to 24,020' MD in submitted plan)
๐Ÿ“„ Email correspondence from Jennifer Yu to Nathaniel Erbele dated 2026-07-07
Operator voluntarily restricts completion interval due to setback requirements, reducing productive lateral length
2026-07-07 General Oilfield Services
Tier 3 Pad expansion from 3.69 acres to 16.50 acres total disturbed area with 57,500 CY excavation and 30,665 CY embankment
๐Ÿ“„ Pad construction data throughout engineering drawings
Massive pad expansion indicates multi-well development with significant earthwork
2026-04-27 General Oilfield Services
Tier 3 Revised azimuth from original plan to 316 degrees with updated plot, plan, cement and casing details
๐Ÿ“„ Page 7 of 11, PROPOSED WORK
Significant directional change from original plan requiring complete redesign
Unknown Directional Drilling
Tier 3 Operator must contact NDIC Field Inspector Dylan Roach (701-770-1981) prior to commencing operationsโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1 of 11, Conditions of Approval
Specific inspector named with direct contact requirement, indicating heightened regulatory oversight
Relative General Oilfield Services
Tier 3 96 proposed stages for completion
๐Ÿ“„ Casing & Cementing Program section, Production Liner notes
High stage count indicates intensive completion design for long lateral
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Revised azimuth (316ยฐ) and complex U-turn geometry require precise execution; as-drilled survey must be submitted prior to completion
Cementing Services
Specific Halliburton cement systems specified; silica flour required in production liner cement due to high BH temps (~198ยฐF)
Pad Construction & Earthwork
Massive pad expansion (16.5 acres) with 57,500 CY excavation indicates imminent site preparation for multi-well pad
Fracture Stimulation
96 proposed stages with toe-initiation design; prior approval required for U-turn well completion procedures
Environmental & Regulatory Compliance
Specific inspector contact required; filter sock container mandate; heightened reporting requirements for this well