๐Ÿ›ข๏ธ MCALMOND 155-89-32-20H 1

HUNT OIL COMPANY ยท Mountrail County, ND ยท File #43095 ยท Generated 2026-08-22 02:51

API
3306105707
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Production liner shoe fully cemented with 'no ability to frac out the shoe'
๐Ÿ“„ Page 1 of 10, Stipulations
Explicit design constraint affecting completion operations. Limits standard frac-out procedures at the shoe, requiring alternative completion engineering.
Unknown Completions / Frac
Tier 3 Operator submitted affidavit confirming executed Surface Damage Settlement and Access Agreement with specific landowners (Veseys) prior to permit approval
๐Ÿ“„ Affidavit of Ryan Harkins
Surface access was formally secured and documented as a prerequisite. Reduces risk of surface owner disputes delaying operations.
2026-04-16 General Oilfield Services
Tier 3 Closed mud system with no cuttings pit mandated
๐Ÿ“„ Page 1 of 10, Stipulations
Non-standard waste handling requirement. Eliminates traditional pits, requiring haul-off or advanced closed-loop systems.
Unknown Mud / Fluids
Tier 3 Specific requirement to contact NDIC Field Inspector Calob Werre (701-822-0147) prior to location construction
๐Ÿ“„ Page 1 of 10, Stipulations
Unusual specificity of inspector name and direct phone contact. Indicates heightened regulatory oversight or site-specific concerns requiring pre-construction coordination.
Relative General Oilfield Services
Tier 3 Permit approval conditional on drilling in conjunction with another well to meet 1220' setback from east/west boundaries
๐Ÿ“„ Page 2 of 10, Conditions of Approval
This is a multi-well dependency; drilling cannot proceed independently. Creates a linked operational sequence and potential timing constraint.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pad Construction & Earthwork
Permit approved 7/8/2026. Must contact inspector Calob Werre BEFORE construction. Significant earthwork (49,585 CY cut, 41,795 CY fill) detailed in plans. Immediate mobilization opportunity.
Closed-Loop Drilling / Cuttings Hauling
Regulatory mandate for 'closed mud system with no cuttings pit' creates non-negotiable demand for these services at spud.
Directional Drilling / MWD
Scientific Drilling planning report indicates vendor selection. Anticollision report shows tight spacing with other wells (e.g., 1.926 ft separation to 20H-2), requiring precise execution.
Completion & Stimulation Engineering
Constraint of 'fully cemented shoe with no ability to frac out' requires specialized completion design prior to stimulation operations.