| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit approved with future date (07/08/2026) and submitted date (06/17/2026) in 2026โฐ TIME-SENSITIVE ๐ Multiple pages (e.g., Page 2, Page 10) Document dates are in the future relative to current analysis, indicating advanced planning and permit longevity. |
2026-07-08 | General Oilfield Services |
| Tier 3 |
Anticollision report shows close approach (1.926 separation factor) to offset well McAlmond 155-89-32-20H-1 ๐ Anticollision Report section Proximity to other planned wells on same pad requires precise directional control. |
2026-05-11 | Directional Drilling |
| Tier 3 |
Waiver required for any changes to casing point, TD, or completion technique within Bakken-Three Forks system ๐ Page 10, Operator understandings Stringent regulatory lock-in of design parameters; any deviation requires prior NDIC approval. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Specific regulatory requirement to contact NDIC Field Inspector Calob Werre (701-822-0147) prior to location construction ๐ Page 1, Conditions of Approval Unusual direct contact requirement for a specific inspector, indicating heightened regulatory oversight or site-specific concerns. |
Unknown | General Oilfield Services |
| Tier 3 |
Production liner shoe fully cemented with 'no ability to frac out the shoe' ๐ Page 1, Conditions of Approval Explicit design constraint limiting completion flexibility; contrasts with typical designs allowing shoe communication. |
Unknown | Completions / Frac |