โ† Back to Daily Permits

๐Ÿ›ข๏ธ MCALMOND 155-89-32-20H 2

HUNT OIL COMPANY ยท Mountrail County, ND ยท File #43096 ยท Generated 2026-08-22 02:51

API
3306105708
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Permit approved with future date (07/08/2026) and submitted date (06/17/2026) in 2026โฐ TIME-SENSITIVE
๐Ÿ“„ Multiple pages (e.g., Page 2, Page 10)
Document dates are in the future relative to current analysis, indicating advanced planning and permit longevity.
2026-07-08 General Oilfield Services
Tier 3 Anticollision report shows close approach (1.926 separation factor) to offset well McAlmond 155-89-32-20H-1
๐Ÿ“„ Anticollision Report section
Proximity to other planned wells on same pad requires precise directional control.
2026-05-11 Directional Drilling
Tier 3 Waiver required for any changes to casing point, TD, or completion technique within Bakken-Three Forks system
๐Ÿ“„ Page 10, Operator understandings
Stringent regulatory lock-in of design parameters; any deviation requires prior NDIC approval.
Unknown Regulatory / Permitting
Tier 3 Specific regulatory requirement to contact NDIC Field Inspector Calob Werre (701-822-0147) prior to location construction
๐Ÿ“„ Page 1, Conditions of Approval
Unusual direct contact requirement for a specific inspector, indicating heightened regulatory oversight or site-specific concerns.
Unknown General Oilfield Services
Tier 3 Production liner shoe fully cemented with 'no ability to frac out the shoe'
๐Ÿ“„ Page 1, Conditions of Approval
Explicit design constraint limiting completion flexibility; contrasts with typical designs allowing shoe communication.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Close well spacing (1.926 separation factor) demands high-precision services; Scientific Drilling already engaged but monitoring/anti-collision services are critical.
Civil Construction & Pad Building
Specific contact requirement with NDIC inspector prior to construction creates a timing gate; pad design by KLJ is complete, ready for construction.
Environmental & Waste Management
Closed mud system, no pits, and filter sock container mandate specialized waste handling and containment services from spud through flowback.
Cementing & Well Integrity
Fully cemented production liner shoe is a non-routine constraint affecting completion design; requires specialized cementing to ensure isolation.