๐Ÿ›ข๏ธ MCALMOND 155-89-32-20H 3

Hunt Oil Company ยท Mountrail County, ND ยท File #43097 ยท Generated 2026-08-22 02:52

API
3306105709
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Unique north setback of 50' (vs standard 150') due to a fully cemented production liner shoe with 'no ability to frac out the shoe'
๐Ÿ“„ Page 2 of 10, Stipulations
A non-standard, reduced boundary setback approved based on a specific, restrictive completion design (fully cemented shoe). This is a deliberate engineering/regulatory choice that limits future completion flexibility.
2026-07-08 Completions / Frac
Tier 3 Wellbore enters target spacing unit from outside; requires justification via drilling a companion well meeting 1220' east/west setback
๐Ÿ“„ Page 2 of 10, Conditions of Approval
Indicates a complex, multi-well pad development strategy where this well's approval is contingent on drilling another specific well to satisfy spacing unit rules. Reveals operator's coordinated pad planning and potential sequencing dependency.
2026-07-08 General Oilfield Services
Tier 3 Operator affidavit confirms wellbore will enter Bakken pool outside target spacing unit, but notice waived because Hunt is operator of offset unit
๐Ÿ“„ Affidavit of Emily DiCarlo
Reveals a cross-unit drilling strategy and leverages the operator's contiguous acreage position to streamline regulatory process (waives notice to others). Shows strategic land management.
2026-04-16 General Oilfield Services
Tier 3 Anticollision report shows tight wellbore spacing with closest approach separation factors as low as 1.559 SF to offset well McAlmond 155-89-32-20H-2
๐Ÿ“„ Anticollision Report Summary
Demonstrates advanced, precise well planning on a dense pad. Separation factors near the warning threshold (1.5) indicate high-risk drilling requiring precise directional control.
2026-04-06 Directional Drilling
Tier 3 Mandatory contact with specific NDIC Field Inspector (Calob Werre) prior to location construction
๐Ÿ“„ Page 2 of 10, Stipulations
Regulatory condition names a specific inspector, indicating a heightened level of oversight or site-specific concerns. Requires a direct, pre-construction communication event.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD/LWD
Anticollision analysis shows very tight wellbore spacing (Separation Factor ~1.56). High-precision directional services are critical and likely to be sourced imminently for drilling expected after permit approval (July 2026).
Pad Construction & Earthwork
Detailed pad design exists (cut/fill volumes, drainage). Mandatory contact with NDIC inspector Calob Werre is a pre-construction gate. Earthwork is a near-term activity following permit approval and that contact.
Cementing (Primary)
The approved well design hinges on a 'fully cemented' production liner shoe. This is a critical path item for both well integrity and to satisfy the setback condition. Spec likely calls for high-quality execution.
Cuttings Handling & Disposal
Permit stipulates 'closed mud system with no cuttings pit' and that 'ALL CUTTINGS WILL BE HAULED TO AN APPROVED FACILITY.' This creates a definite, ongoing service need from spud through drilling.