| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Unique north setback of 50' (vs standard 150') due to a fully cemented production liner shoe with 'no ability to frac out the shoe' ๐ Page 2 of 10, Stipulations A non-standard, reduced boundary setback approved based on a specific, restrictive completion design (fully cemented shoe). This is a deliberate engineering/regulatory choice that limits future completion flexibility. |
2026-07-08 | Completions / Frac |
| Tier 3 |
Wellbore enters target spacing unit from outside; requires justification via drilling a companion well meeting 1220' east/west setback ๐ Page 2 of 10, Conditions of Approval Indicates a complex, multi-well pad development strategy where this well's approval is contingent on drilling another specific well to satisfy spacing unit rules. Reveals operator's coordinated pad planning and potential sequencing dependency. |
2026-07-08 | General Oilfield Services |
| Tier 3 |
Operator affidavit confirms wellbore will enter Bakken pool outside target spacing unit, but notice waived because Hunt is operator of offset unit ๐ Affidavit of Emily DiCarlo Reveals a cross-unit drilling strategy and leverages the operator's contiguous acreage position to streamline regulatory process (waives notice to others). Shows strategic land management. |
2026-04-16 | General Oilfield Services |
| Tier 3 |
Anticollision report shows tight wellbore spacing with closest approach separation factors as low as 1.559 SF to offset well McAlmond 155-89-32-20H-2 ๐ Anticollision Report Summary Demonstrates advanced, precise well planning on a dense pad. Separation factors near the warning threshold (1.5) indicate high-risk drilling requiring precise directional control. |
2026-04-06 | Directional Drilling |
| Tier 3 |
Mandatory contact with specific NDIC Field Inspector (Calob Werre) prior to location construction ๐ Page 2 of 10, Stipulations Regulatory condition names a specific inspector, indicating a heightened level of oversight or site-specific concerns. Requires a direct, pre-construction communication event. |
Relative | General Oilfield Services |