| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Anticollision report shows close approaches to multiple offset wells (separation factors 1.7-2.8) ๐ Anticollision report summary Multiple nearby wellbores require precise directional control; closest approach to McAlmond 155-89-32-20H-3 at 1.739 separation factor |
2026-04-06 | Directional Drilling |
| Tier 3 |
Specific NDIC field inspector pre-notification required before location constructionโฐ TIME-SENSITIVE ๐ Permit stipulations page Operator must contact specific inspector Calob Werre (701-822-0147) prior to construction, indicating heightened regulatory oversight or site-specific concerns |
Relative | Drilling Rigs |
| Tier 3 |
South boundary setback reduced to 50' based on cemented production liner design ๐ Permit stipulations Regulatory exception granted for tighter spacing due to engineered cementing solution |
Unknown | General Oilfield Services |
| Tier 3 |
Mandatory filter sock container requirement with specific placarding and leakproof specifications ๐ Filter socks notice and operator assertions Explicit container specs from spud through flowback, with waiver requiring Sundry Notice |
Relative | Regulatory / Permitting |
| Tier 3 |
Production liner shoe fully cemented with no ability to frac out the shoe ๐ Permit stipulations and drilling program Unusual completion constraint that eliminates contingency for shoe fracturing, indicating deliberate isolation design |
Unknown | Completions / Frac |