โ† Back to Daily Permits

๐Ÿ›ข๏ธ OAKLAND 154-89-5-17H 1

HUNT OIL COMPANY ยท Mountrail County, ND ยท File #43098 ยท Generated 2026-08-22 02:52

API
3306105710
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Anticollision report shows close approaches to multiple offset wells (separation factors 1.7-2.8)
๐Ÿ“„ Anticollision report summary
Multiple nearby wellbores require precise directional control; closest approach to McAlmond 155-89-32-20H-3 at 1.739 separation factor
2026-04-06 Directional Drilling
Tier 3 Specific NDIC field inspector pre-notification required before location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit stipulations page
Operator must contact specific inspector Calob Werre (701-822-0147) prior to construction, indicating heightened regulatory oversight or site-specific concerns
Relative Drilling Rigs
Tier 3 South boundary setback reduced to 50' based on cemented production liner design
๐Ÿ“„ Permit stipulations
Regulatory exception granted for tighter spacing due to engineered cementing solution
Unknown General Oilfield Services
Tier 3 Mandatory filter sock container requirement with specific placarding and leakproof specifications
๐Ÿ“„ Filter socks notice and operator assertions
Explicit container specs from spud through flowback, with waiver requiring Sundry Notice
Relative Regulatory / Permitting
Tier 3 Production liner shoe fully cemented with no ability to frac out the shoe
๐Ÿ“„ Permit stipulations and drilling program
Unusual completion constraint that eliminates contingency for shoe fracturing, indicating deliberate isolation design
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying
Close anticollision tolerances (separation factors as low as 1.7) require high-precision services immediately upon spud
Waste management and filtration
Mandatory filter sock container requirement begins at spud and continues through completion and flowback
Cementing services
Production liner shoe fully cemented with no frac-out capability requires specialized cementing design and execution
Regulatory compliance consulting
Specific inspector notification requirement and multiple stipulations create need for compliance coordination