๐Ÿ›ข๏ธ JAFFA 5303 14-1 2B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #43099 ยท Generated 2026-08-22 02:53

API
3310506845
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration specified for production liner to enable wireline toe initiation, avoiding tubing/tractor perforation
๐Ÿ“„ Section 1.10 and Wellbore Schematics
Non-standard cementing design with intentional 400' uncemented annulus at liner toe for operational efficiency and cost reduction
Unknown Completions / Frac
Tier 3 Drill-back notification affidavit confirms formal notification to adjacent operator (Devon Energy) on 2/11/2026
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Demonstrates proactive regulatory compliance and inter-operator coordination for wells traversing adjacent spacing units
2026-02-11 General Oilfield Services
Tier 3 Anticipated commencement date of July 15, 2025 conflicts with permit dates in 2026โฐ TIME-SENSITIVE
๐Ÿ“„ Section 1.8
Date discrepancy suggests planning timeline shift or document inconsistency; drilling may have been planned earlier than permit dates indicate
2025-07-15 General Oilfield Services
Tier 3 Facility design uses indirect heater with setback exemption (Case No. 28949 Order No. 31500) allowing 60' from wellhead
๐Ÿ“„ Facility Statement
Non-standard equipment placement approved via specific regulatory exception
Unknown General Oilfield Services
Tier 3 Specific NDIC field inspector (Jessica Gilkey) must be contacted prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10
Named regulatory point of contact creates specific compliance pathway; not routine generic inspector notification
Relative General Oilfield Services
Tier 3 Anti-collision statement reveals use of real-time corrected surveys, gamma ray signatures, and 1.2 separation safety factor
๐Ÿ“„ Anti-Collision Statement
Detailed collision avoidance protocol exceeds basic requirements; indicates complex wellbore environment with multiple existing wells
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Complex anti-collision requirements with 1.2 separation factor and real-time monitoring needed for pad with multiple existing wells
Cementing Services
Wet shoe configuration requires precise cement displacement (7 barrels over-displacement) and specialized liner cementing
Wireline Services
Wet shoe design enables wireline toe initiation; perforation services needed for first stage
Drill Cuttings Disposal
Operator has pre-selected disposal facilities; hauling contractors needed for dry cuttings to licensed facilities
Regulatory Compliance & Inspection
Specific inspector contact required before construction; sundry notices must be filed within 3 business days of spudding