| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe configuration specified for production liner to enable wireline toe initiation, avoiding tubing/tractor perforation ๐ Section 1.10 and Wellbore Schematics Non-standard cementing design with intentional 400' uncemented annulus at liner toe for operational efficiency and cost reduction |
Unknown | Completions / Frac |
| Tier 3 |
Drill-back notification affidavit confirms formal notification to adjacent operator (Devon Energy) on 2/11/2026 ๐ Affidavit Affirming Drill-Back Notification Demonstrates proactive regulatory compliance and inter-operator coordination for wells traversing adjacent spacing units |
2026-02-11 | General Oilfield Services |
| Tier 3 |
Anticipated commencement date of July 15, 2025 conflicts with permit dates in 2026โฐ TIME-SENSITIVE ๐ Section 1.8 Date discrepancy suggests planning timeline shift or document inconsistency; drilling may have been planned earlier than permit dates indicate |
2025-07-15 | General Oilfield Services |
| Tier 3 |
Facility design uses indirect heater with setback exemption (Case No. 28949 Order No. 31500) allowing 60' from wellhead ๐ Facility Statement Non-standard equipment placement approved via specific regulatory exception |
Unknown | General Oilfield Services |
| Tier 3 |
Specific NDIC field inspector (Jessica Gilkey) must be contacted prior to location constructionโฐ TIME-SENSITIVE ๐ Page 2 of 10 Named regulatory point of contact creates specific compliance pathway; not routine generic inspector notification |
Relative | General Oilfield Services |
| Tier 3 |
Anti-collision statement reveals use of real-time corrected surveys, gamma ray signatures, and 1.2 separation safety factor ๐ Anti-Collision Statement Detailed collision avoidance protocol exceeds basic requirements; indicates complex wellbore environment with multiple existing wells |
Unknown | Directional Drilling |