| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit expiration deadline: well must be completed as Saltwater Injection well by July 13, 2027, or permit expiresโฐ TIME-SENSITIVE ๐ Page 3 of 10, UIC stipulations Creatures a hard deadline for completion and injection operations, driving urgency in construction and commissioning timeline |
2027-07-13 | General Oilfield Services |
| Tier 3 |
Requirement to submit detailed facility schematic and construction dates within 30 days of construction completionโฐ TIME-SENSITIVE ๐ Page 2 of 10, UIC stipulations Creates a defined post-construction documentation window with specific content requirements |
Relative | General Oilfield Services |
| Tier 3 |
Pressure test required on high-pressure injection pipeline (100 psi over permitted max) prior to injection, with detailed reporting ๐ Page 2 of 10, UIC stipulations Specific testing protocol exceeds routine pressure testing requirements |
Relative | General Oilfield Services |
| Tier 3 |
SWD facilities co-located with planned oil production facilities within same berms ๐ UIC Plan section 7 |
Unknown | General Oilfield Services |
| Tier 3 |
Tank diking variance approved contingent on submission of as-built schematic after construction ๐ Page 3 of 10, UIC stipulations Regulatory flexibility granted but requires post-construction documentation, indicating non-standard facility design |
Relative | General Oilfield Services |
| Tier 3 |
No plans to take third-party volumes at this time ๐ UIC Plan section 6 Explicit statement limiting disposal to operator's own production, indicating captive use strategy |
Unknown | General Oilfield Services |