| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Multi-well pad with backbuild design requiring waiver from NDIC Order 31848 for wells entering Bakken system outside target spacing unit ๐ Letter to Todd Holweger dated January 28th, 2026 Operator is drilling 5 wells (1H-LL, 2H, 3H, 4H, 5H) from single pad with trajectories entering adjacent spacing units, requiring regulatory waiver and demonstrating complex pad development strategy |
2026-01-28 | Directional Drilling |
| Tier 2 |
Wet shoe design with ability to frac out the toe, plus backup hyd toe sleeve in case wet shoe fails ๐ Completion & Perforation section, Target Details Unusual completion design with redundant systems for toe initiation; wet shoe with frac-out capability indicates specific completion methodology |
Unknown | Completions / Frac |
| Tier 3 |
Pad re-grading and well relocation occurred between permit versions (REV: 02 01-12-26) ๐ Pad Layout section, Earthwork calculations Pad design revised after initial permitting, indicating iterative planning or response to site conditions |
2026-01-12 | General Oilfield Services |
| Tier 3 |
First perforation point approximately 100' from hard line and 250' from section line within spacing unit ๐ Completion & Perforation section Specific perforation placement relative to property boundaries suggests optimized drainage or regulatory compliance strategy |
Unknown | General Oilfield Services |
| Tier 3 |
Closed mud system with cuttings disposal to specific licensed facility (Smoky Butte Environmental, LLC) ๐ Disposal of Drill Cuttings section Explicit waste disposal contractor named; closed system indicates environmental compliance focus |
Unknown | Mud / Fluids |