โ† Back to Daily Permits

๐Ÿ›ข๏ธ AKEMI FERRARI 14-11-2 4H

Phoenix Operating LLC ยท Divide County, ND ยท File #43115 ยท Generated 2026-08-22 02:55

API
3302301841
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Backbuild Order Waiver requested for 5-well pad entering Bakken outside target spacing unit
๐Ÿ“„ Letter to NDIC dated January 28th, 2026
Multi-well pad requires regulatory waiver for crossing spacing unit boundaries; operator self-notifying as adjacent unit operator
2026-01-28 Directional Drilling
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre unit, with north setback based on production liner cemented with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, Conditions of Approval
Specific setback requirements tied to completion design (wet shoe) rather than standard setbacks; indicates engineered approach to boundary compliance
Unknown Completions / Frac
Tier 3 Pad re-graded and wells moved per revision 02 dated 01-12-26
๐Ÿ“„ Pad Layout drawing notes
Recent pad redesign indicates changed well locations and earthwork requirements
2026-01-12 General Oilfield Services
Tier 3 Drill cuttings disposal pre-selected to Smoky Butte Environmental, LLC at specific address
๐Ÿ“„ Disposal of Drill Cuttings section
Specific waste disposal vendor named in permit; closed loop system with metal containers required
Unknown General Oilfield Services
Tier 3 Operator acknowledges giving 21-31 days prior written notice to operators of wells in same/adjacent pools within 2,640 feet of completion intervalsโฐ TIME-SENSITIVE
๐Ÿ“„ Operator Assertions section
Extended notification window (up to 31 days) for nearby operators; requires planning ahead for completion operations
Relative General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section
Specific inspector named with direct contact requirement before construction begins
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Site Construction & Earthwork
Pad recently re-graded (01-12-26 revision); 55,300 cu yds cut and 65,110 cu yds fill required; specific slope and compaction specifications
Directional Drilling & MWD
Complex trajectory crossing spacing units; anti-collision concerns with multiple offset wells; specific survey requirements (100 ft vertical, 30 ft curve, 90 ft lateral)
Cementing & Completions
Wet shoe design with frac-out capability; specific cement formulations and volumes; hydraulic toe sleeve backup system; completion notice requirements to adjacent operators
Waste Management
Closed loop system required; cuttings to Smoky Butte Environmental; filter sock container required from spud through flow-back