| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Backbuild Order Waiver requested for 5-well pad entering Bakken outside target spacing unit ๐ Letter to NDIC dated January 28th, 2026 Multi-well pad requires regulatory waiver for crossing spacing unit boundaries; operator self-notifying as adjacent unit operator |
2026-01-28 | Directional Drilling |
| Tier 2 |
Approval conditional on 150' north/south and 500' east/west setbacks within 1920-acre unit, with north setback based on production liner cemented with wet shoe and ability to frac out shoe ๐ Stipulations section, Conditions of Approval Specific setback requirements tied to completion design (wet shoe) rather than standard setbacks; indicates engineered approach to boundary compliance |
Unknown | Completions / Frac |
| Tier 3 |
Pad re-graded and wells moved per revision 02 dated 01-12-26 ๐ Pad Layout drawing notes Recent pad redesign indicates changed well locations and earthwork requirements |
2026-01-12 | General Oilfield Services |
| Tier 3 |
Drill cuttings disposal pre-selected to Smoky Butte Environmental, LLC at specific address ๐ Disposal of Drill Cuttings section Specific waste disposal vendor named in permit; closed loop system with metal containers required |
Unknown | General Oilfield Services |
| Tier 3 |
Operator acknowledges giving 21-31 days prior written notice to operators of wells in same/adjacent pools within 2,640 feet of completion intervalsโฐ TIME-SENSITIVE ๐ Operator Assertions section Extended notification window (up to 31 days) for nearby operators; requires planning ahead for completion operations |
Relative | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Robert Stafford prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations section Specific inspector named with direct contact requirement before construction begins |