๐Ÿ›ข๏ธ AKEMI FERRARI 14-11-2 5H

Phoenix Operating LLC ยท Divide County, ND ยท File #43116 ยท Generated 2026-08-22 02:57

API
3302301842
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 North setback exception granted based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Page 1 of 10, Stipulations section
Regulatory exception granted for specific completion design (wet shoe with frac-out capability). Indicates customized engineering approval beyond standard setbacks.
Unknown Completions / Frac
Tier 3 Operator submitted Backbuild Order Waiver request for pad wells entering Bakken outside target spacing unit
๐Ÿ“„ Letter from Phoenix Energy dated January 28th, 2026
Shows proactive regulatory engagement for multi-well pad with complex trajectories. Waiver eliminates notification requirement to adjacent operator (Phoenix Energy is both operator and adjacent operator).
2026-01-28 Regulatory / Permitting
Tier 3 Operator must provide 21-31 day written notice to operators of wells in same/adjacent pools within 2640 feet of completion intervalsโฐ TIME-SENSITIVE
๐Ÿ“„ Page 7 of 10, Operator Assertions
Creates mandatory notification window before completion operations. Requires operator to identify and contact nearby operators, creating coordination requirements and potential for frac interference management services.
Relative Completions / Frac
Tier 3 Well requires drilling in conjunction with another well to meet 1220' setback from east/west boundaries for spacing unit justification
๐Ÿ“„ Page 2 of 10, Stipulations section
Creates interdependency between wells; failure to drill companion well could invalidate permit. Indicates multi-well coordination requirement beyond standard single-well approval.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Survey
Complex trajectory with backbuild waiver requirement. Anti-collision concerns with multiple offset wells. Taktikal Directional already engaged but may need field execution partners.
Specialized Cementing
Wet shoe installation required for regulatory setback exception. Multiple cement types specified (Type III, Class G/POZ with various additives). Cement top job required if fallback >10' below ground.
Waste Management & Environmental
Closed mud system required. Cuttings disposal pre-arranged with Smoky Butte Environmental but may need transportation services. Filter sock container management required from spud through flowback.
Pad Construction & Earthwork
Large earthwork volumes (65,110 cu yds). Detailed grading specifications. Uintah Engineering design complete, but construction contractors needed. 18" culvert installation required.