๐Ÿ›ข๏ธ AJ 1 SWD

Phoenix Operating LLC ยท Divide County, ND ยท File #43118 ยท Generated 2026-08-22 02:59

API
3302301843
Target Formation
Dakota Group (Inyan Kara Formation)
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Permit expiration deadline: well must be completed as SWD by July 14, 2027, or permit expires.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, UIC Stipulations
Creates a hard deadline for drilling, completion, and facility construction. Operator must complete all work within ~1 year from permit approval (July 2026) to avoid permit lapse.
2027-07-14 General Oilfield Services
Tier 3 Operator plans to inject only water from on-pad wells (no third-party volumes at this time). SWD facilities co-located with oil facilities within same berms.
๐Ÿ“„ UIC Plan, Sections 6 & 7
Reveals a closed-loop, pad-specific disposal strategy. Co-location indicates integrated pad design and shared infrastructure.
Unknown Mud / Fluids
Tier 3 Requirement to submit detailed facility schematic and construction dates via Sundry Form within 30 days after construction completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10, UIC Stipulations
Adds a specific post-construction reporting burden with a short turnaround (30 days). Requires scaled drawings of entire facility.
Relative General Oilfield Services
Tier 3 Pressure test on high-pressure injection pipeline (100 psi over permitted max) required prior to injection, with results reported on a Sundry Form.
๐Ÿ“„ Page 2 of 10, UIC Stipulations
Non-routine, specific pressure test requirement beyond standard well testing. Includes detailed reporting of test intervals and pipeline specs.
Relative General Oilfield Services
Tier 3 SPCC Plan must be implemented within six months of commissioning.โฐ TIME-SENSITIVE
๐Ÿ“„ UIC Plan, Section 8
Specific deadline for SPCC plan implementation post-commissioning, not tied to permit date.
Relative General Oilfield Services
Tier 3 Tank diking variance approved contingent on submission of as-built schematic after construction.
๐Ÿ“„ Page 3 of 10, UIC Stipulations
Regulatory flexibility granted (variance) but with a specific post-construction compliance requirement. Indicates non-standard tank dike dimensions.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Completion Services
Permit has a completion deadline of July 14, 2027. Drilling must commence soon to allow time for drilling, casing, completion (perforation, packer, tree installation), MIT test, and facility construction.
Civil Construction & Earthwork
Large pad (~15 acres disturbed) with significant earthwork (145k+ cu yds cut/fill). Road construction ('A' and 'B') needed. Perimeter berm, tank containment, and liner installation are stipulated. Construction must start to meet deadline.
Automation & SCADA Integration
Operator has declared use of 24-hour SCADA with specific alarms and ESDV integration. System must be designed and installed for both SWD and co-located production facilities, requiring integration services.
Surveying & As-Built Documentation
Variance requires as-built schematic post-construction. Regulatory stipulation requires scaled facility schematic within 30 days of construction completion. Immediate need post-build.
Pressure Testing & Pipeline Inspection
Specific regulatory requirement for high-pressure injection pipeline test (100 psi over max) prior to injection. Specialized testing services required before startup.