๐Ÿ›ข๏ธ BUCKSKIN 1 SWD

Phoenix Operating LLC ยท Divide County, ND ยท File #43120 ยท Generated 2026-08-22 03:00

API
3302301844
Target Formation
Inyan Kara Formation (Dakota Group)
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Permit expiration deadline: well must be completed as SWD by July 14, 2027, or permit expires.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, Date: 7/14/2026
Creates a hard deadline for completion, driving urgency in construction and commissioning activities.
2027-07-14 General Oilfield Services
Tier 3 Approach permit approved by township chairman via email on May 26, 2026, with specific contractor (Martin Construction) named.
๐Ÿ“„ Appendix F
Road construction contractor pre-selected and approval documented informally via email, indicating advanced planning and potential locked-in vendor.
2026-05-26 General Oilfield Services
Tier 3 Operator must notify NDIC Field Inspector Gunther Harms (701-770-2564) prior to location construction.
๐Ÿ“„ Page 3 of 10, Date: 7/14/2026
Specific inspector named and contact provided, indicating a personalized regulatory oversight and required pre-construction notification.
Relative General Oilfield Services
Tier 3 SPCC Plan must be implemented within six months of commissioning.โฐ TIME-SENSITIVE
๐Ÿ“„ UIC Plan, Section 8
Post-commissioning regulatory requirement with a strict 6-month deadline, indicating need for environmental planning services.
Relative General Oilfield Services
Tier 3 Tank diking variance approved contingent on submission of as-built schematic after construction.
๐Ÿ“„ Page 3 of 10, Date: 7/14/2026
Regulatory flexibility granted but with a post-construction compliance requirement, indicating a specific follow-up action needed.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Completion Services
Permit issued with spud notification requirement and a completion deadline of July 14, 2027. Detailed drilling and completion program specified, indicating imminent operations.
Facility Construction & Tank Installation
Tank diking variance approved but requires as-built submission. Facility construction must commence to meet permit deadline, with specific requirements for liners, berms, and containment.
Pipeline Pressure Testing & Inspection
Regulatory stipulation requires a 100 psi over-pressure test on the injection pipeline prior to injection, with results reported on a Sundry Form. This is a mandatory pre-injection step.
Environmental & SPCC Planning
SPCC Plan must be developed and implemented within six months of commissioning, creating a near-term need for environmental consultants post-construction.
Surveying & As-built Documentation
Requirement to submit as-built site schematic within 30 days of construction completion for the tank diking variance and facility approval.