๐Ÿ›ข๏ธ TWO PENCE FEDERAL 5102 43-32 5BX

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #43121 ยท Generated 2026-08-22 03:01

API
3305310842
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Wet shoe completion design with 400' uncemented annulus at toe for wireline perforating
๐Ÿ“„ Section 1.11 Wet Shoe, Page 13
Non-standard cementing approach to enable cheaper wireline perforating instead of tubing-conveyed or tractor methods
Unknown Completions / Frac
Tier 3 BLM notification required for federal minerals in spacing unitโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Doug Jackson, July 13, 2026
Additional federal regulatory layer identified after permit submission
2026-07-13 General Oilfield Services
Tier 3 Surface Use Agreement executed for off-lease drilling from pad
๐Ÿ“„ Affidavit Affirming Surface Use Agreement
Legal agreement in place for multi-well pad drilling outside spacing unit
2026-06-10 General Oilfield Services
Tier 3 Drill-back notification to Devon Energy for off-spacing unit drilling
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Formal notification to competitor about wellbores traversing their unit; reveals competitive awareness
2025-11-20 Drilling Rigs
Tier 3 Indirect heater with setback exemption (Case No. 28949 Order No. 31500)
๐Ÿ“„ Facility Statement, Page 13
Regulatory variance allows equipment placement closer than standard setbacks
Unknown General Oilfield Services
Tier 3 Closed mud system with no cuttings pit specified
๐Ÿ“„ Page 1, Stipulations
Non-standard waste management requirement affecting drilling fluid handling
Unknown Mud / Fluids
Tier 3 Mandatory contact with NDIC Field Inspector Will Ryan prior to location construction
๐Ÿ“„ Page 2, Permit Review Policy
Specific inspector named with direct contact requirement before construction begins
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Anti-collision analysis shows tight spacing with existing wells (6.45' separation); requires precise execution and real-time monitoring
Cementing & Completion Services
Wet shoe design requires specialized cementing approach; CBL logs mandated on multiple casing strings
Waste Management & Disposal
Closed mud system requirement; multiple licensed disposal facilities listed; filter sock container mandate
Pad Construction & Earthwork
Anticipated commencement July 15, 2025; specific inspector contact required before construction; 7.19 acre pad with detailed earthwork quantities