๐Ÿ›ข๏ธ Bluefin 13F 2H

Devon Energy Williston, L.L.C ยท McKenzie County, ND ยท File #43130 ยท Generated 2026-08-22 03:03

API
3305310844
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe design on production liner with ability to frac out the toe, used to justify reduced south toe setback to 150'
๐Ÿ“„ Permit Information - Stipulations & Proposed Drilling Plan Schematic, Pages 2 & 4 of 11
Specific completion technology (wet shoe) is integral to the approved well design and spacing exception, indicating a planned, engineered frac-out operation.
2026-07-17 Completions / Frac
Tier 3 Mandatory closed mud system with no cuttings pit and specific cuttings disposal to Select Water Solutions, LLC landfill
๐Ÿ“„ Permit Information - Stipulations & Proposed Drilling Plan, Pages 2 & 4 of 11
Non-standard waste handling requirement that pre-selects a disposal vendor and dictates specific surface equipment (closed loop system).
2026-07-17 Mud / Fluids
Tier 3 U-turn horizontal well design with lateral closer than 500 feet to parallel spacing unit boundary, requiring pre-approval of fracture stimulation procedures and as-built survey
๐Ÿ“„ Permit Information - Stipulations, Page 2 of 11
Indicates complex wellbore geometry with regulatory hurdles; requires specific engineering and regulatory submissions before completion, creating a gated opportunity for service providers.
2026-07-17 Directional Drilling
Tier 3 Operator notified XTO Energy Inc. of adjacent spacing unit entry for Bluefin 13F 1H & 3H per Order 31848, but this well (13F 2H) is part of the same pad campaign
๐Ÿ“„ Affidavit of Notification, last page
Shows proactive regulatory compliance for multi-well pad affecting adjacent operator (XTO). Signals potential for coordinated operations or communication between Devon and XTO.
2026-07-02 General Oilfield Services
Tier 3 Pre-spud notification required directly to NDIC Field Inspector Steven Ray (701-989-9183) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit Information - Stipulations, Page 3 of 11
Creates a specific, personal point of contact for regulatory kick-off, indicating heightened oversight or site-specific sensitivities.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Advanced MWD/Surveying
Complex U-turn well path with specific survey frequency requirements (100' vertical, 30' curve, 90' lateral) and mandatory as-built survey submission for regulatory exception. Must be executed precisely to meet boundary constraints.
Cementing & Liner Completion Services
Wet shoe system is critical to approved design. Cementing program is detailed with specific slurry designs for surface, intermediate, and production liner. Top of cement jobs may be required.
Closed-Loop Drilling Waste Management
Permit mandates closed mud system with no cuttings pit and disposal at specified landfill. This service is locked in and must be mobilized at spud.
Fracture Stimulation Design & Regulatory Submission
Pre-approval of fracture stimulation procedures is required before completion due to boundary proximity. Creates immediate need for engineering design and regulatory packaging.
Pad Construction & Earthwork
Must contact NDIC Field Inspector Steven Ray prior to construction. Detailed earthwork specs (compaction, materials) and berm requirements exist. Construction cannot begin until 3rd business day after permit publication unless waived.