โ† Back to Daily Permits

๐Ÿ›ข๏ธ LEATHERMAN 12-1-36-25 1H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43131 ยท Generated 2026-08-22 03:04

API
3305310845
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 1 Approval conditional on 150' north/south and 500' east/west setbacks within 1280-acre spacing unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ STIPULATIONS section, NDIC Field Order Info
Specific setback requirements tied to cementing and completion design (wet shoe) indicate regulatory focus on boundary protection and completion integrity, impacting well placement and frac design
Unknown Completions / Frac
Tier 3 Operator requests waiver of backbuild order notification requirements citing Phoenix Energy as majority working interest owner in adjacent spacing units
๐Ÿ“„ Letter from Meaghan Coughlan, Senior Regulatory Specialist, dated June 17th, 2026
Proactive regulatory strategy to waive notification requirements for wells entering Bakken outside target spacing unit, leveraging common ownership
2026-06-17 Regulatory / Permitting
Tier 3 Well must be drilled in conjunction with a well that meets 1220' setback from east/west spacing unit boundaries to justify spacing unit
๐Ÿ“„ Page 2, spacing unit justification requirement
Drilling approval contingent on another well meeting specific setback, indicating multi-well coordination and potential pad development sequencing
Unknown Directional Drilling
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval, Construction Commencement Notification
Explicit pre-construction contact requirement with named inspector indicates heightened regulatory oversight or site-specific concerns
Relative General Oilfield Services
Tier 3 Drill cuttings disposal pre-selected to Select Water Solutions, LLC Special Waste Landfill at specific address
๐Ÿ“„ DISPOSAL OF DRILL CUTTINGS section
Vendor pre-selection for waste disposal indicates established relationship and logistics planning
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Complex trajectory with specific setback requirements and multi-well coordination; Taktikal Directional already engaged but precise execution critical
Cementing & Completion Services
Wet shoe installation and frac-out capability required; cementing program detailed with specific slurry designs and contingency planning
Earthwork & Pad Construction
Pre-construction notification to NDIC inspector required; pad layout shows multi-well development with extensive earthwork quantities
Waste Management
Closed mud system with cuttings disposal pre-awarded to Select Water Solutions; filter sock container requirements ongoing