๐Ÿ›ข๏ธ LEATHERMAN 12-1-36-25 2H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43132 ยท Generated 2026-08-22 03:05

API
3305310846
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 1220' east/west setbacks within 1280-acre spacing unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Permit Information - Stipulations
Unusual setback requirements tied to specific completion design (wet shoe with frac-out capability) rather than standard regulatory setbacks
Unknown Completions / Frac
Tier 3 Waiver request for backbuild order notification requirements due to Phoenix Energy being majority working interest owner in adjacent spacing units
๐Ÿ“„ Letter to NDIC dated June 17th, 2026
Operator seeking regulatory relief from standard notification requirements for wells entering adjacent spacing units
2026-06-17 Regulatory / Permitting
Tier 3 Wet shoe with ability to frac out the toe specified in completion design
๐Ÿ“„ Completion & Perforation annotations
Explicit design choice for toe stimulation rather than standard plug-and-perf
Unknown Completions / Frac
Tier 3 Closed mud system with no cuttings pit required, with cuttings to be hauled to Select Water Solutions, LLC Special Waste Landfill
๐Ÿ“„ Permit Review Policy and Disposal of Drill Cuttings section
Specific disposal facility named (Select Water Solutions) rather than generic requirement
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk (701-590-5317) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit Review Policy
Specific inspector named with direct contact requirement before construction begins
Relative General Oilfield Services
Tier 3 First perf point at approximately 100' from hard line and 250' from section line
๐Ÿ“„ Completion diagram annotations
Specific perforation placement relative to boundaries indicates careful spacing optimization
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling Services
Detailed directional plan already developed by Taktikal Directional; opportunity for execution services or competing directional providers
Waste Management/Hauling
Specific disposal facility named but hauling services not specified; opportunity for logistics and transportation services
Completion/Stimulation Services
Wet shoe design with frac-out capability requires specialized completion expertise; stimulation planning not yet specified
Pad Construction/Earthwork
Detailed earthwork quantities (65,430 Cu. Yds. total cut) and pad design completed; construction timing imminent based on permit approval
Regulatory Coordination
Specific inspector contact required before construction; opportunity for regulatory consulting to manage pre-construction requirements