โ† Back to Daily Permits

๐Ÿ›ข๏ธ LEATHERMAN 12-1-36-25 3H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43133 ยท Generated 2026-08-22 03:05

API
3305310847
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north/south and 500' east/west setbacks within 1280-acre spacing unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Page 1, Stipulations section
Specific setback requirements tied to completion design (wet shoe) rather than standard setbacks, indicating regulatory focus on zonal isolation and frac containment
Unknown Completions / Frac
Tier 2 Operator utilizing wet shoe with ability to frac out toe as part of completion design
๐Ÿ“„ Page 4, schematic notes and Page 1 stipulations
Specific completion technique declared in regulatory filing rather than standard perf-and-plug
Unknown Completions / Frac
Tier 3 Backbuild Order Waiver requested via letter dated June 17th, 2026, citing Phoenix Energy as majority WI owner of adjacent spacing units
๐Ÿ“„ Letter from Meaghan Coughlan, Senior Regulatory Specialist
Operator seeking regulatory relief for wells entering Bakken outside target spacing unit, leveraging corporate ownership structure
2026-06-17 Regulatory / Permitting
Tier 3 Closed mud system with no cuttings pit required
๐Ÿ“„ Page 1, Stipulations section
Mandates specific waste handling infrastructure beyond standard practices
Unknown Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, Stipulations section
Personalized regulatory contact requirement rather than generic office notification
Relative General Oilfield Services
Tier 3 Drill cuttings disposal pre-selected to Select Water Solutions, LLC Special Waste Landfill at specific address
๐Ÿ“„ Page 4, Disposal of Drill Cuttings section
Vendor and location explicitly declared in permit rather than left to operational discretion
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD/LWD
Complex trajectory with precise setback requirements (150'/500') and long lateral (20,650' displacement); need for accurate placement to meet regulatory conditions
Cementing and zonal isolation
Specific cementing requirements for production liner with wet shoe; top of cement calculations required; conditional approval tied to cement integrity
Closed-loop drilling fluids and cuttings handling
Mandated closed mud system with no cuttings pit; pre-selected disposal vendor but fluid management and containerization services needed
Hydraulic fracturing with toe-initiation capabilities
Wet shoe design requires specialized frac-out equipment and expertise; operator committed to this completion method