| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 150' north/south and 500' east/west setbacks within 1280-acre spacing unit, with north setback based on production liner cemented in lateral with wet shoe and ability to frac out shoe ๐ Page 1, Stipulations section Specific setback requirements tied to completion design (wet shoe) rather than standard setbacks, indicating regulatory focus on zonal isolation and frac containment |
Unknown | Completions / Frac |
| Tier 2 |
Operator utilizing wet shoe with ability to frac out toe as part of completion design ๐ Page 4, schematic notes and Page 1 stipulations Specific completion technique declared in regulatory filing rather than standard perf-and-plug |
Unknown | Completions / Frac |
| Tier 3 |
Backbuild Order Waiver requested via letter dated June 17th, 2026, citing Phoenix Energy as majority WI owner of adjacent spacing units ๐ Letter from Meaghan Coughlan, Senior Regulatory Specialist Operator seeking regulatory relief for wells entering Bakken outside target spacing unit, leveraging corporate ownership structure |
2026-06-17 | Regulatory / Permitting |
| Tier 3 |
Closed mud system with no cuttings pit required ๐ Page 1, Stipulations section Mandates specific waste handling infrastructure beyond standard practices |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location constructionโฐ TIME-SENSITIVE ๐ Page 1, Stipulations section Personalized regulatory contact requirement rather than generic office notification |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings disposal pre-selected to Select Water Solutions, LLC Special Waste Landfill at specific address ๐ Page 4, Disposal of Drill Cuttings section Vendor and location explicitly declared in permit rather than left to operational discretion |
Unknown | General Oilfield Services |