| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback exception based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 1 of 10, Stipulations Unusual regulatory allowance for reduced setback (150' vs standard) based on specific completion design |
Unknown | Completions / Frac |
| Tier 3 |
Backbuild Order Waiver requested for wells entering Bakken outside target spacing unit ๐ Letter from Phoenix Energy dated June 17th, 2026 Regulatory waiver sought for cross-boundary drilling; operator cites majority working interest ownership as justification |
2026-06-17 | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location constructionโฐ TIME-SENSITIVE ๐ Page 1 of 10, Stipulations Specific inspector named; pre-construction contact mandated; indicates heightened regulatory oversight |
Relative | General Oilfield Services |
| Tier 3 |
Closed mud system with no cuttings pit required; cuttings to be hauled to Select Water Solutions landfill ๐ Page 1 of 10, Stipulations and Proposed Drilling Plan Specific disposal facility named; closed system mandated; indicates environmental sensitivity or regulatory requirement |
Unknown | Mud / Fluids |
| Tier 3 |
Well requires drilling in conjunction with another well to meet 1220' setback from east/west boundaries for spacing unit justification ๐ Page 2 of 10, Conditions of Approval Creates interdependency between wells; drilling cannot proceed independently; indicates pad coordination requirement |
Relative | General Oilfield Services |