๐Ÿ›ข๏ธ ICEMAN 28-21-16-9 1H

Phoenix Operating LLC ยท Divide County, ND ยท File #43135 ยท Generated 2026-08-22 03:06

API
3302301845
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Approval conditional on drilling in conjunction with another well to meet 1220' setback from east/west boundaries
๐Ÿ“„ Page 2 of 10
Requires coordination with another well to justify spacing unit, indicating multi-well pad dependency and potential sequencing constraints
2026-07-21 General Oilfield Services
Tier 3 Operator must provide directional drilling and completion plans to adjacent spacing unit operator (KODA RESOURCES OPERATING, LLC) per NDIC Order 31848โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit section
Reveals regulatory requirement for cross-unit coordination and information sharing with competitor
2026-07-20 Directional Drilling
Tier 3 Wet shoe design with ability to frac out the toe, plus backup hydraulic toe sleeve in case wet shoe fails
๐Ÿ“„ Completion diagram section
Unusual redundancy in completion design with both wet shoe and backup hydraulic toe sleeve
Unknown Completions / Frac
Tier 3 Specific requirement to contact NDIC Field Inspector Marc Binns (701-770-2564) prior to location construction
๐Ÿ“„ Page 1 of 10
Named inspector with direct contact requirement indicates heightened regulatory oversight or site-specific concerns
Unknown General Oilfield Services
Tier 3 Explicit waiver request for acoustic/sonic logs via separate sundry notice
๐Ÿ“„ Page 4 of 10
Operator opting out of standard logging program requires regulatory approval
Unknown Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling services
Detailed planning report from Taktikal Directional dated May 21, 2026 indicates imminent need for directional drilling execution following permit approval on July 21, 2026
Earthwork and pad construction
Specific construction commencement notification requirement to NDIC inspector Marc Binns indicates pad construction is pending regulatory clearance
Specialized completion services
Wet shoe with frac-out capability and backup hydraulic toe sleeve design suggests need for specialized completion tool providers
Waste management and disposal
Pre-selected disposal facility (Smoky Butte Environmental) indicates immediate need for cuttings hauling upon drilling commencement