| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Approval conditional on drilling in conjunction with another well to meet 1220' setback from east/west boundaries ๐ Page 2 of 10 Requires coordination with another well to justify spacing unit, indicating multi-well pad dependency and potential sequencing constraints |
2026-07-21 | General Oilfield Services |
| Tier 3 |
Operator must provide directional drilling and completion plans to adjacent spacing unit operator (KODA RESOURCES OPERATING, LLC) per NDIC Order 31848โฐ TIME-SENSITIVE ๐ Affidavit section Reveals regulatory requirement for cross-unit coordination and information sharing with competitor |
2026-07-20 | Directional Drilling |
| Tier 3 |
Wet shoe design with ability to frac out the toe, plus backup hydraulic toe sleeve in case wet shoe fails ๐ Completion diagram section Unusual redundancy in completion design with both wet shoe and backup hydraulic toe sleeve |
Unknown | Completions / Frac |
| Tier 3 |
Specific requirement to contact NDIC Field Inspector Marc Binns (701-770-2564) prior to location construction ๐ Page 1 of 10 Named inspector with direct contact requirement indicates heightened regulatory oversight or site-specific concerns |
Unknown | General Oilfield Services |
| Tier 3 |
Explicit waiver request for acoustic/sonic logs via separate sundry notice ๐ Page 4 of 10 Operator opting out of standard logging program requires regulatory approval |
Unknown | Regulatory / Permitting |