| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Use of a 'wet shoe with ability to frac out the toe' specified in completion design ๐ Proposed Drilling Plan schematic notes Specific completion hardware and technique called out, indicating a tailored approach for this lateral's geometry and regulatory setback. |
Unknown | Completions / Frac |
| Tier 3 |
U-turn horizontal well design requiring pre-approval of fracture stimulation procedures due to wellbore proximity (<500 ft) to parallel spacing unit boundary ๐ Page 2 of 11, Stipulations section Indicates a complex well path (U-turn) with regulatory hurdles for completion; requires specific fracture procedure approval before operations, creating a gating item for service companies. |
2026-07-22 | Directional Drilling |
| Tier 3 |
BLM notification required for federal minerals, indicating spacing unit may contain federal leasesโฐ TIME-SENSITIVE ๐ Email from Jeremy Giesen (NDIC) dated 2026-07-16 Additional regulatory layer (BLM) must be cleared before drilling, adding potential delay. |
2026-07-16 | General Oilfield Services |
| Tier 3 |
Rig specified: Nabors B06 ๐ Total Directional Plan Report, Project Details Drilling rig is pre-selected, indicating contract in place. |
2026-06-25 | Directional Drilling |
| Tier 3 |
Waiver requested for Acoustic/Sonic and Density/Porosity logs ๐ Page 4 of 11, PROPOSED LOGS section Operator is opting out of standard data acquisition, which may indicate reliance on offset data or different formation evaluation strategy. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Explicit drilling waste disposal contractor named: Select Water Solutions, LLC Special Waste Landfill ๐ Proposed Drilling Plan, Section 4 Vendor pre-selected for waste disposal, indicating an established contract or preferred provider. |
Unknown | General Oilfield Services |
| Tier 3 |
Mandatory pre-construction contact with NDIC Field Inspector Steven Ray (701-989-9183) and perimeter berm requirement ๐ Page 1 of 11, Conditions of Approval Direct regulatory point-of-contact specified; perimeter berm is a specific site construction requirement beyond standard. |
Unknown | General Oilfield Services |