๐Ÿ›ข๏ธ Bluefin 13F 3H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #43138 ยท Generated 2026-08-22 03:08

API
3305310849
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Use of a 'wet shoe with ability to frac out the toe' specified in completion design
๐Ÿ“„ Proposed Drilling Plan schematic notes
Specific completion hardware and technique called out, indicating a tailored approach for this lateral's geometry and regulatory setback.
Unknown Completions / Frac
Tier 3 U-turn horizontal well design requiring pre-approval of fracture stimulation procedures due to wellbore proximity (<500 ft) to parallel spacing unit boundary
๐Ÿ“„ Page 2 of 11, Stipulations section
Indicates a complex well path (U-turn) with regulatory hurdles for completion; requires specific fracture procedure approval before operations, creating a gating item for service companies.
2026-07-22 Directional Drilling
Tier 3 BLM notification required for federal minerals, indicating spacing unit may contain federal leasesโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Jeremy Giesen (NDIC) dated 2026-07-16
Additional regulatory layer (BLM) must be cleared before drilling, adding potential delay.
2026-07-16 General Oilfield Services
Tier 3 Rig specified: Nabors B06
๐Ÿ“„ Total Directional Plan Report, Project Details
Drilling rig is pre-selected, indicating contract in place.
2026-06-25 Directional Drilling
Tier 3 Waiver requested for Acoustic/Sonic and Density/Porosity logs
๐Ÿ“„ Page 4 of 11, PROPOSED LOGS section
Operator is opting out of standard data acquisition, which may indicate reliance on offset data or different formation evaluation strategy.
Unknown Regulatory / Permitting
Tier 3 Explicit drilling waste disposal contractor named: Select Water Solutions, LLC Special Waste Landfill
๐Ÿ“„ Proposed Drilling Plan, Section 4
Vendor pre-selected for waste disposal, indicating an established contract or preferred provider.
Unknown General Oilfield Services
Tier 3 Mandatory pre-construction contact with NDIC Field Inspector Steven Ray (701-989-9183) and perimeter berm requirement
๐Ÿ“„ Page 1 of 11, Conditions of Approval
Direct regulatory point-of-contact specified; perimeter berm is a specific site construction requirement beyond standard.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
U-turn well design with precise boundary setbacks requires high-accuracy steering and survey submission for regulatory compliance (as-built survey required).
Fracture Stimulation Design & Execution
Pre-approval of fracture procedures is mandated due to wellbore proximity to boundary; wet shoe/frac-out design requires specialized pumping and tool coordination.
Site Construction & Earthwork
Perimeter berm requirement, closed mud system, and detailed pad construction plans in sheets C-1 to C-8 indicate imminent grading and pad build.
Waste Hauling & Disposal
Closed-loop system with cuttings going to Select Water Solutions; filter sock container requirement from spud through flowback creates ongoing waste handling need.