๐Ÿ›ข๏ธ MAGNUM 5301 36 6BX

ENERPLUS RESOURCES USA CORPORATION ยท McKenzie County, ND ยท File #43144 ยท Generated 2026-08-22 03:09

API
3305310850
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Use of a 'wet shoe' liner configuration for cost-effective toe initiation
๐Ÿ“„ Section 1.11 Wet Shoe and accompanying schematic
Design involves intentionally over-displacing cement by 7 barrels to create ~400 ft of uncemented annulus at the liner toe. This allows pumping down first-stage perforating guns on wireline, avoiding more expensive tubing-conveyed or tractor methods.
Unknown Completions / Frac
Tier 3 Closed mud system with no cuttings pit required; cuttings must go to licensed disposal facility
๐Ÿ“„ Permit Stipulations & Section 1.10 Licensed Facilities
Permit stipulation mandates a closed mud system. Operator declares cuttings will be hauled to the closest available licensed facility from a pre-vetted list (e.g., Ideal Oilfield Disposal, IHD Solids Management).
2026-07-22 Mud / Fluids
Tier 3 Mandatory contact with specific NDIC Field Inspector (Marc Binns) prior to pad expansion or conductor setting
๐Ÿ“„ Permit Stipulations Page 3
Regulatory condition names a specific inspector (Marc Binns, 701-770-2564) who must be contacted before two specific operations: expanding the pad or setting conductor. This is a personalized regulatory checkpoint.
2026-07-22 General Oilfield Services
Tier 3 Casing inspection log required on deep-set surface casing prior to setting next string
๐Ÿ“„ Permit Stipulations Page 2
Beyond standard CBLs, a specific casing inspection log is mandated on the 13-3/8-inch surface casing before drilling ahead. This is a non-routine integrity check.
2026-07-22 General Oilfield Services
Tier 3 Waiver requested for mandatory adjacent operator notification due to common parent company (Chord Energy)
๐Ÿ“„ Letter to NDIC dated Monday, July 20, 2026
Operator requests waiver from notifying adjacent operator (Oasis Petroleum North America LLC) because both are subsidiaries of Chord Energy. This bypasses a standard regulatory step.
2026-07-20 Regulatory / Permitting
Tier 3 Off-spacing drilling from surface location outside target unit with executed Surface Use Agreement
๐Ÿ“„ Affidavit affirming Surface Use Agreement
Well is drilled from a pad in Lot 7, Sec 4, T152N, R101W into 'off-lease' units (S25,36 T153N R101W & S30,31 T153N R100W). Requires a Surface Use Agreement with the landowner, indicating complex surface access negotiations are already resolved.
2026-07-20 General Oilfield Services
Tier 3 Anticipated drilling commencement date explicitly stated as July 15, 2025, in operator's proposed workโฐ TIME-SENSITIVE
๐Ÿ“„ Section 1.8 Anticipated Starting Dates
The document contains a forward-looking operational date (Jul 15, 2025) for well commencement, which is specific and pre-dates the permit approval date (Jul 22, 2026). This indicates advanced planning and a target timeline.
2025-07-15 Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / Surveying
High-density anti-collision planning required with over 40 offset wellbores identified. Specific survey frequencies mandated (100' vertical, 30' curve, 90' lateral). The anti-collision statement reveals use of real-time corrected surveys and gamma ray signatures for avoidance, indicating need for advanced MWD/geosteering services.
Cementing & Casing Services
Complex casing program with deep surface casing, intermediate string, and a wet shoe production liner. Multiple Cement Bond Logs (CBL) required, including a zero-pressure pass on surface casing. Specific centralizer placement mandated. The wet shoe design requires precise cement over-displacement.
Waste Hauling & Solids Disposal
Closed mud system stipulation creates immediate, non-optional demand for hauling dry cuttings to one of the named licensed facilities. This service is locked in prior to spud.
Wireline Perforating
The wet shoe design is specifically intended to enable wireline pump-down of the first stage perforating guns. This creates a definitive opportunity for wireline perforating services at the toe of the well.
Pad Construction & Civil Work
Must contact NDIC Field Inspector Marc Binns BEFORE expanding pad or setting conductor. New pad construction statement details material sourcing and compaction specs. Indicates civil work is a regulated, pre-spud critical path item.