โ† Back to Daily Permits

๐Ÿ›ข๏ธ Sloane 25-24-13 1HF

Rockport Energy Solutions LLC ยท McKenzie County, ND ยท File #43145 ยท Generated 2026-08-22 03:09

API
3305310851
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe system specified in production liner for frac-out capability
๐Ÿ“„ Stipulations and Well Program
Unique completion design with ported sub and wet shoe system to enable frac-out of shoe, indicating specialized completion approach
Unknown Completions / Frac
Tier 3 Federal mineral involvement requiring BLM coordinationโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele
Permit applications flagged as potentially subject to Federal permit due to spacing unit composition; requires BLM documentation verification
2026-07-23 General Oilfield Services
Tier 3 Drill-back notification to adjacent operator (Chord Energy) with detailed technical disclosure
๐Ÿ“„ Waiver - Drill Back Offset Operator Notification
Operator proactively disclosed directional plan, casing design, and cementing details to competitor, indicating potential unit boundary crossing or coordination requirement
2026-07-23 Directional Drilling
Tier 3 Off-unit well requiring surface use agreement with landowner due to off-spacing
๐Ÿ“„ Affidavit Affirming Surface Use Agreement
Well is off-spacing, requiring executed surface use agreement with landowner, indicating potential land access complexity and pre-construction negotiation
2026-07-07 General Oilfield Services
Tier 3 Core and sample submission requirements with strict deadlines (30 days for cuttings, 180 days for cores)โฐ TIME-SENSITIVE
๐Ÿ“„ Cores and Samples letter
Regulatory requirement with specific post-drilling deadlines creates time-bound service window for sample handling and shipping
Relative General Oilfield Services
Tier 3 Rig contract pre-selected with Patterson 290
๐Ÿ“„ Proposed Work section
Operator has already signed rig contract, locking in specific drilling contractor before permit approval
Relative Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pad construction and earthwork
Dirt work scheduled for 10/01/2026 with detailed cut/fill plan (22,100 cu yds cut, 24,380 cu yds fill); immediate mobilization needed after permit approval
Environmental and waste management
Filter sock container requirement from spud through flowback; dry cuttings hauling to approved facility; time-sensitive waste handling services needed
Completion and stimulation services
Wet shoe system and specialized liner design indicate complex completion; 15K wellhead equipment and 11,500 psi casing test requirements create high-spec service needs
Surveying and directional services
Complex trajectory with multiple inflection points, anti-collision concerns with existing wells; ongoing surveying requirements throughout drilling