๐Ÿ›ข๏ธ Sloane 25-24-13 2HF

Rockport Energy Solutions LLC ยท McKenzie County, ND ยท File #43146 ยท Generated 2026-08-22 03:10

API
3305310852
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Operator signed rig contract with Patterson 290 for 4-well pad, with estimated spud date 11/1/2026 and location construction start 10/01/2026โฐ TIME-SENSITIVE
๐Ÿ“„ Page 6 of 10, Proposed Work section
Reveals specific drilling contractor selection and firm timeline for multi-well pad development
2026-11-01 Drilling Rigs
Tier 3 Federal minerals involvement flagged by NDIC on July 23, 2026, requiring BLM coordination for spacing unit
๐Ÿ“„ Federal Minerals email from Nathaniel Erbele
Permit subject to additional federal oversight; BLM documentation required beyond state approval
2026-07-23 General Oilfield Services
Tier 3 Waiver of drill-back offset operator notification provided to Chord Energy on July 23, 2026, with detailed directional plan shared
๐Ÿ“„ Waiver - Drill Back Offset Operator Notification
Shows proactive regulatory engagement with competitor (Chord Energy) and disclosure of detailed drilling/completion plans
2026-07-23 Directional Drilling
Tier 3 Surface Use Agreement affidavit signed July 7, 2026 for off-unit location covering all 4 wells on pad
๐Ÿ“„ Affidavit Affirming Surface Use Agreement
Surface access secured early for entire pad; demonstrates land department execution ahead of permit approval
2026-07-07 General Oilfield Services
Tier 3 North setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Page 2 of 10, Stipulations section
Specific engineering condition tied to regulatory setback approval; implies planned completion technique
Unknown Completions / Frac
Tier 3 Dry cuttings will be hauled to State approved disposal facility (not closed-loop system)
๐Ÿ“„ Drilling Prognosis, Note after Summary Drilling Procedure
Explicit waste handling method declared; differs from operators using on-site cuttings management
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pad Construction & Earthwork
Location construction planned to start 10/01/2026; detailed earthwork quantities (24,380 cu yds) and pad design complete
Drilling Fluids & Waste Hauling
Dry cuttings specified for hauling to approved facility; oil-based mud planned for intermediate section
Completion & Stimulation Services
Wet shoe system specified; 15K wellhead equipment required; casing test to 11,500 psi; frac operations planned post-drilling
Surveying & Directional Services
Detailed directional plan exists but MWD/surveying contractors not yet named; anti-collision concerns with existing wells noted
Environmental & Compliance
BLM coordination required for federal minerals; filter sock container mandate; erosion control plan needed before spud