| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Operator signed rig contract with Patterson 290 with estimated spud date 11/1/2026 and location build start 10/01/2026โฐ TIME-SENSITIVE ๐ Page 6 of 10, PROPOSED WORK section Explicit rig contract and firm timeline disclosed in permit; shows advanced planning and commitment |
2026-11-01 | Drilling Rigs |
| Tier 3 |
North setback condition based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 2 of 10, STIPULATIONS section Specific completion technique requirement (wet shoe system) imposed as regulatory condition for boundary setback |
2026-07-23 | Completions / Frac |
| Tier 3 |
Federal minerals notification required - BLM must be contacted for proper documentationโฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele dated 7/23/2026 Additional federal regulatory layer identified after permit approval; creates potential delay vector |
2026-07-23 | General Oilfield Services |
| Tier 3 |
Operator must drill this well in conjunction with another well that meets a 1220' setback from east/west boundaries to justify the spacing unit ๐ Page 3 of 10, WELL INFORMATION section Creates interdependency between wells on pad; forces coordinated drilling schedule and potentially affects pad sequencing |
2026-07-23 | General Oilfield Services |
| Tier 3 |
Dry cuttings from this well will be hauled to State approved disposal facility (not standard closed mud system only) ๐ Drilling Prognosis section, Note after Summary Drilling Procedure Explicit waste handling method specified beyond standard closed mud system requirement |
Unknown | Mud / Fluids |