๐Ÿ›ข๏ธ Cottonwood 16-3321H

EOG Resources, Inc. ยท Mountrail County, ND ยท File #43162 ยท Generated 2026-08-22 03:15

API
3306105713
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' north and 500' west setbacks within Alger-Bakken Unit, with north setback based on cemented production liner with wet shoe and ability to 'frac out the shoe'.
๐Ÿ“„ PERMIT INFORMATION, STIPULATIONS section (Condition of Approval)
Specific geosteering and completion constraint tied to unit boundary. 'Frac out the shoe' indicates a planned, intentional stimulation at the liner shoe.
2026-07-28 Completions / Frac
Tier 2 Production liner design includes a 'wet shoe' and a request to 'frac out the toe' using a standard burst plug.
๐Ÿ“„ 4 1/2" Production Liner & Cementing Notes section
Specific completion technique disclosed: cemented liner with open shoe, toe stimulation via burst plug. Non-standard 'frac out' request to regulator.
Unknown Completions / Frac
Tier 3 Approximate drilling start date provided in waiver requests as 11/15/2026.โฐ TIME-SENSITIVE
๐Ÿ“„ Waiver Request letter dated April 15, 2026
Explicit target spud date provided to regulators, indicating project scheduling and pad development timing.
2026-11-15 Regulatory / Permitting
Tier 3 Waiver granted for open hole logs, relying on offset well data within a mile (Cottonwood 5-34H, File #17937). Only GR-CBL from TD to surface required.
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 43162, DESCRIPTION (OPERATOR) section
Reduces logging scope and cost; indicates operator confidence in existing subsurface data and a standardized development approach.
2026-07-30 Regulatory / Permitting
Tier 3 BLM notification required due to federal minerals within the 14,029-acre Alger-Bakken Unit.
๐Ÿ“„ Email from Doug Jackson (NDIC) to Jennifer Yu dated 2026-07-20
Introduces federal oversight layer (BLM Dickinson office) beyond state regulation, adding complexity and potential timing delay.
2026-07-20 General Oilfield Services
Tier 3 Facility equipment is located on a different lease (Ross 5 NWNW - CTB, Lot 4, Sec 5), requiring off-lease affidavit.
๐Ÿ“„ PROPOSED WORK section and AFFIDAVIT IN RE OFF LEASE MEASUREMENT
Centralized production facilities for multiple wells (pad), indicating infrastructure planning beyond single well.
2026-04-08 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Marc Binns (701-770-2564) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ PERMIT INFORMATION, STIPULATIONS section (Construction Commencement Notification)
Personalized regulatory point of contact for pre-spud inspection, indicating heightened oversight or specific site conditions.
Relative General Oilfield Services
Tier 3 Drilling program notes plan to switch to Oil-Based Mud (OBM) if pressures >10.0 ppg are encountered.
๐Ÿ“„ DRILLING FLUIDS PROGRAM section
Contingency for unexpected pressure indicates awareness of geological risk. OBM is a more expensive, non-routine fluid system.
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Fluids
Target spud ~Nov 15, 2026. Contingency for OBM switch presents potential spot market opportunity. Rig and directional drilling services will be needed for ~60-90 day operation.
Completion & Stimulation
Design indicates cemented liner, toe initiation via burst plug, and intent to stimulate shoe. This signals upcoming need for plug-and-perf services, frac crews, and specific downhole tools in Q1/Q2 2027 (post-drilling).
Civil Construction & Pad Build
Pad design by KLJ Engineering is complete (Feb 2026). Construction must commence after permit approval and inspector notification (Marc Binns). Earthwork (27,990 CY cut), berms, and access road construction are imminent pre-spud activities.
Facilities & Flowlines
Central production facility (Ross 5 NWNW-CTB) will require construction/expansion to handle production from this 5-well pad. Inter-pad flowlines and hook-up needed post-completion.
Regulatory & Compliance
BLM involvement due to federal minerals adds a layer of permitting. Services related to federal APDs, NEPA, or BLM liaison could be required before drilling can proceed.