๐Ÿ›ข๏ธ Ross 114-0616H

EOG Resources, Inc. ยท Mountrail County, ND ยท File #43164 ยท Generated 2026-08-22 03:16

API
3306105715
Target Formation
Three Forks First Bench (B1)
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Approval conditional on 150' setback from south boundary and 500' setback from east/west boundaries within Alger-Bakken Unit. South setback based on production liner cemented in lateral with a wet shoe and ability to frac out the shoe.
๐Ÿ“„ STIPULATIONS, Conditions of Approval
Specific, non-standard boundary setbacks tied to unique completion design (cemented liner with wet shoe). Implies a tailored geosteering and completion strategy to manage unit boundaries.
2026-07-28 Completions / Frac
Tier 3 Waiver of open hole logs approved, relying on offset well Cottonwood 5-34H (File #17937) within a mile for formation tops. Only GR-CBL from TD to ground level required.
๐Ÿ“„ Sundry Form for Well File No.: 43164, DESCRIPTION (OPERATOR) and REVIEWER COMMENTS
Reduces logging costs and operational time. Indicates operator confidence in subsurface characterization from nearby data, potentially setting a precedent for log waivers in the area.
2026-07-31 Regulatory / Permitting
Tier 3 Facility equipment is located on a different lease (Ross 5 NWNW - CTB, Lot 4, Sec 5). Requires off-lease affidavit acknowledging surface use agreement allows off-spacing facilities placement.
๐Ÿ“„ PROPOSED WORK and AFFIDAVIT IN RE OFF LEASE MEASUREMENT
Centralized production facilities not on the drill pad. Requires validated surface agreements, indicating a multi-well pad development strategy with shared infrastructure.
2026-04-08 General Oilfield Services
Tier 3 Pad design includes a proposed 20,944 sq ft, 4-foot deep 'moat' holding ~14,920 barrels of water, added to final plat after initial design.
๐Ÿ“„ Pad Layout notes and 'ROSS 6 NENW' plat details
Large, engineered containment feature beyond standard berms. Suggests planned water management for frac flowback or stormwater, indicating large-scale water handling needs.
2026-02-04 Completions / Frac
Tier 3 Spudding requires immediate notification to NDIC Field Inspector or Bismarck office, plus a Sundry Notice filed in NorthSTAR within 3 business days with specific details (drilling contractor, rig number, etc.).โฐ TIME-SENSITIVE
๐Ÿ“„ STIPULATIONS, Construction Commencement Notification
Strict, short-turnaround reporting requirements post-spud. Indicates regulatory focus on real-time operational tracking.
Relative Drilling Rigs
Tier 3 EOG must contact NDIC Field Inspector Marc Binns (701-770-2564) prior to location construction. Construction commencement requires waiting until 3rd business day after permit publication unless waived by Director.โฐ TIME-SENSITIVE
๐Ÿ“„ STIPULATIONS, Construction Commencement Notification
Mandatory pre-construction contact with a specific inspector creates a regulatory gate. The waiting period adds scheduling rigidity unless a waiver is sought.
Relative Drilling Rigs
Tier 3 Drilling plan includes contingency to switch to Oil-Based Mud (OBM) if weight exceeds 10.0 ppg due to higher than expected pressures.
๐Ÿ“„ DRILLING FLUIDS PROGRAM
Pre-planned fluid system switch indicates anticipation of potential pressure challenges. Requires having OBM systems and materials on standby.
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Earthwork & Pad Construction
Pad design finalized with major earthwork quantities defined (27,990 CY excavation, 19,090 CY fill) and a large containment 'moat' added. Construction must wait for regulatory contact (Marc Binns) and permit publication waiting period.
Directional Drilling & Geosteering
Well path has strict boundary setbacks (150'/500') and a long lateral (~20,000 ft). Precision is critical to stay within unit boundaries and for the planned cemented liner/wet shoe completion.
Specialized Cementing & Completions
Plan includes a cemented production liner with a wet shoe designed to be 'frac'd out'. This requires precise slurry design (silica flour for high temp) and execution to enable the completion technique.
Water Management
The designed 'moat' indicates planned need for large-scale water storage (~14,920 bbl). Relevant for frac water supply, flowback containment, or stormwater management.
Regulatory & Compliance Reporting
Multiple time-sensitive notifications required: pre-construction contact, immediate spud notification, and Sundry filing within 3 business days post-spud. Specialized reporting services can add value.