| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback exception granted based on 'production liner cemented in lateral with wet shoe and ability to frac out shoe' - specific engineering solution for boundary compliance ๐ Stipulations - NDIC Field Order Info Non-standard setback approval reveals customized completion design (wet shoe assembly) enabling closer approach to north boundary |
2026-07-29 | Completions / Frac |
| Tier 3 |
Core and sample submission deadlines: cuttings within 30 days of drilling completion, cores within 180 days - with Form 4 required for extensionsโฐ TIME-SENSITIVE ๐ Cores and Samples letter Specific regulatory deadlines create post-drilling compliance timeline; operator must plan sample handling and shipping |
2026-08-03 | General Oilfield Services |
| Tier 3 |
Permit condition requires contacting NDIC Field Inspector Marc Binns (701-770-2564) PRIOR to location construction - not just pre-spudโฐ TIME-SENSITIVE ๐ Permit Information - Conditions of Approval Unusual pre-construction notification requirement suggests heightened regulatory oversight or sensitive location |
2026-07-29 | General Oilfield Services |
| Tier 3 |
Drill-back waiver affidavit filed because wellbore enters Bakken Pool outside target spacing unit (Sec 5 T160N R100W) - operator self-waived notice requirement as they control offset unit ๐ Affidavit of Emily DiCarlo section Reveals complex pad development strategy with wellbores crossing unit boundaries; operator leveraging own leasehold to streamline regulatory process |
2026-07-23 | Regulatory / Permitting |
| Tier 3 |
Surface damage agreement executed with Robert & Shanna Rude - affidavit filed May 20, 2026 confirming all surface owners signed ๐ Affidavit of Ryan Harkins Surface access fully secured well before permit approval, indicating advanced land work and reduced surface risk |
2026-05-20 | General Oilfield Services |
| Tier 3 |
Anti-collision report shows close approaches (1.5-3.9 separation factor) with 8 offset wells on same pad - including 4 planned wells and 4 existing wells ๐ Anti-collision Report section High-density pad development requires precise directional control; multiple wells with separation factors near minimum safety thresholds |
2026-04-23 | Directional Drilling |