| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe assembly specified for completion with placement at least 150' from section line, enabling frac out of shoe ๐ NDIC Field Order Info and tubular details Non-standard completion technique with specific geometric constraints affecting frac design and execution |
Unknown | Completions / Frac |
| Tier 3 |
Drill-back waiver affidavit filed for wellbore entering Bakken Petroleum System outside target spacing unit, with Hunt as operator of offset unit negating notice requirement ๐ Affidavit of Emily DiCarlo Indicates complex pad development strategy with wellbores traversing unit boundaries, requiring regulatory navigation and demonstrating multi-unit targeting intent |
2026-07-28 | Regulatory / Permitting |
| Tier 3 |
Specific diesel fuel non-use commitment letter covering multiple wells including this one, submitted well before permit approval ๐ Hunt letter to NDIC dated May 20, 2026 Proactive regulatory compliance on sensitive environmental issue, bundled across multiple wells to streamline approvals |
2026-05-20 | Completions / Frac |
| Tier 3 |
Anticollision report shows tight spacing with offset wells (Separation Factors as low as 1.837-3.267) requiring sophisticated well planning ๐ Anticollision Report summary Demonstrates high-density pad development with minimal clearance between wellbores, increasing drilling complexity and risk |
2026-04-23 | Directional Drilling |
| Tier 3 |
Mandatory pre-construction contact with specific NDIC Field Inspector Marc Binns prior to location constructionโฐ TIME-SENSITIVE ๐ Construction Commencement Notification Personalized regulatory oversight requirement rather than generic office contact, indicating heightened scrutiny or specific site conditions |
Relative | General Oilfield Services |