โ† Back to Daily Permits

๐Ÿ›ข๏ธ ALEXANDRIA 161-100-34-27H-2

HUNT OIL COMPANY ยท Divide County, ND ยท File #43169 ยท Generated 2026-08-22 03:17

API
3302301849
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe assembly specified for completion with placement at least 150' from section line, enabling frac out of shoe
๐Ÿ“„ NDIC Field Order Info and tubular details
Non-standard completion technique with specific geometric constraints affecting frac design and execution
Unknown Completions / Frac
Tier 3 Drill-back waiver affidavit filed for wellbore entering Bakken Petroleum System outside target spacing unit, with Hunt as operator of offset unit negating notice requirement
๐Ÿ“„ Affidavit of Emily DiCarlo
Indicates complex pad development strategy with wellbores traversing unit boundaries, requiring regulatory navigation and demonstrating multi-unit targeting intent
2026-07-28 Regulatory / Permitting
Tier 3 Specific diesel fuel non-use commitment letter covering multiple wells including this one, submitted well before permit approval
๐Ÿ“„ Hunt letter to NDIC dated May 20, 2026
Proactive regulatory compliance on sensitive environmental issue, bundled across multiple wells to streamline approvals
2026-05-20 Completions / Frac
Tier 3 Anticollision report shows tight spacing with offset wells (Separation Factors as low as 1.837-3.267) requiring sophisticated well planning
๐Ÿ“„ Anticollision Report summary
Demonstrates high-density pad development with minimal clearance between wellbores, increasing drilling complexity and risk
2026-04-23 Directional Drilling
Tier 3 Mandatory pre-construction contact with specific NDIC Field Inspector Marc Binns prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification
Personalized regulatory oversight requirement rather than generic office contact, indicating heightened scrutiny or specific site conditions
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
High-density pad with separation factors as low as 1.837 demands premium directional services and real-time anti-collision monitoring; Scientific Drilling already engaged for planning
Specialized Completions
Wet shoe assembly requirement for boundary-proximal lateral creates need for specific completion engineering and execution expertise
Civil Construction & Pad Building
18,020 CY excavation with specific grading, diking, and impermeable material requirements; KLJ Engineering designs indicate complex pad construction
Environmental & Regulatory Compliance
Mandatory inspector contact, filter sock container management, diesel-free frac fluid compliance, and drill-back waivers create ongoing compliance service needs