โ† Back to Daily Permits

๐Ÿ›ข๏ธ ALEXANDRIA 161-100-34-27H-3

Hunt Oil Company ยท Divide County, ND ยท File #43170 ยท Generated 2026-08-22 03:17

API
3302301850
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 North setback approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ STIPULATIONS - NDIC Field Order Info
Non-standard setback exception tied to specific completion technique (wet shoe assembly) and frac-out capability
Unknown Completions / Frac
Tier 3 Drill-back waiver affidavit filed because wellbore enters Bakken Petroleum System outside target spacing unit
๐Ÿ“„ Affidavit of Emily DiCarlo section
Indicates complex pad drilling with wellbores traversing multiple spacing units, requiring regulatory compliance with NDIC Order 31848 for adjacent unit operators
2026-07-28 Regulatory / Permitting
Tier 3 Anticollision report shows close approaches with multiple offset wells on pad, including separation factors as low as 1.793
๐Ÿ“„ Anticollision Report section
High-density pad drilling with tight well spacing requiring sophisticated directional planning and real-time monitoring
2026-04-23 Directional Drilling
Tier 3 Core and sample submission deadlines: cuttings within 30 days, cores within 180 days of drilling completionโฐ TIME-SENSITIVE
๐Ÿ“„ RE: CORES AND SAMPLES letter
Strict regulatory timelines with civil penalties up to $12,500 per day violation
Relative General Oilfield Services
Tier 3 Specific requirement to contact NDIC Field Inspector Marc Binns (701-770-2564) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit Information - Construction Commencement Notification
Named inspector with direct contact requirement indicates heightened regulatory oversight or site-specific concerns
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
Anticollision report shows tight well spacing (separation factors 1.793-4.583) requiring precision drilling; Scientific Drilling already engaged
Sample Handling & Logistics
Strict 30/180-day deadlines for sample submission post-drilling with significant penalties for non-compliance
Pad Construction & Earthwork
KLJ engineering plans show 18,020 CY excavation, 11,935 CY embankment, 6.93 acre disturbed area - major earthmoving scope
Regulatory Compliance Consulting
Drill-back waivers, named inspector protocols, and multiple specialized stipulations indicate complex regulatory landscape