๐Ÿ›ข๏ธ Wagner 1-4H

Murfin Drilling Company, Inc. ยท Stark County, ND ยท File #43171 ยท Generated 2026-08-22 03:17

API
3308900921
Target Formation
Three Forks First Bench (B1)
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Production liner cemented in lateral with wet shoe and no ability to frac out the shoe
๐Ÿ“„ STIPULATIONS section, Wellbore Schematic note
Unusual completion design constraint affecting stimulation operations
2026-07-30 Completions / Frac
Tier 3 BLM notification required for federal minerals in spacing units - operator must contact BLM Dickinson officeโฐ TIME-SENSITIVE
๐Ÿ“„ Outlook email from Doug Jackson
Additional federal regulatory layer beyond state requirements
2026-07-29 General Oilfield Services
Tier 3 Drillback order 31848 requires notification to adjacent spacing unit operator Whiting Oil and Gas Corporation with detailed directional/completion plans
๐Ÿ“„ Affidavit Affirming Notification to Adjacent Spacing Unit - Drillback Order 31848
Regulatory requirement for drilling outside target spacing unit creates coordination obligation with competitor operator
2026-07-16 Directional Drilling
Tier 3 Surface damage affidavit confirms executed agreement for drilling into adjacent spacing unit (Sections 4 & 9) from pad in Section 3
๐Ÿ“„ Surface Damage Affidavit
Surface access secured for cross-boundary drilling operation
2026-07-16 General Oilfield Services
Tier 3 Wet shoe sub utilized to pump perforating guns down for stage 1 but NOT for wellbore stimulation
๐Ÿ“„ Wellbore Schematic note
Specific tooling approach for stage 1 only
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling services
Complex trajectory with nudge section, build section, and precise anti-collision requirements due to dense existing well environment
Cementing services
Specialized cementing requirements for production liner with wet shoe configuration and inability to frac out shoe
Perforation services
Wet shoe sub required specifically for stage 1 perforation gun deployment
Regulatory coordination services
BLM federal minerals notification required plus drillback order coordination with competitor operator Whiting