| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Production liner cemented in lateral with wet shoe and no ability to frac out the shoe ๐ STIPULATIONS section, Wellbore Schematic note Unusual completion design constraint affecting stimulation operations |
2026-07-30 | Completions / Frac |
| Tier 3 |
BLM notification required for federal minerals in spacing units - operator must contact BLM Dickinson officeโฐ TIME-SENSITIVE ๐ Outlook email from Doug Jackson Additional federal regulatory layer beyond state requirements |
2026-07-29 | General Oilfield Services |
| Tier 3 |
Drillback order 31848 requires notification to adjacent spacing unit operator Whiting Oil and Gas Corporation with detailed directional/completion plans ๐ Affidavit Affirming Notification to Adjacent Spacing Unit - Drillback Order 31848 Regulatory requirement for drilling outside target spacing unit creates coordination obligation with competitor operator |
2026-07-16 | Directional Drilling |
| Tier 3 |
Surface damage affidavit confirms executed agreement for drilling into adjacent spacing unit (Sections 4 & 9) from pad in Section 3 ๐ Surface Damage Affidavit Surface access secured for cross-boundary drilling operation |
2026-07-16 | General Oilfield Services |
| Tier 3 |
Wet shoe sub utilized to pump perforating guns down for stage 1 but NOT for wellbore stimulation ๐ Wellbore Schematic note Specific tooling approach for stage 1 only |
Unknown | Completions / Frac |