๐Ÿ›ข๏ธ SETTER FED 22-27-34 2HF

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43181 ยท Generated 2026-08-22 03:19

API
3305310858
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Backbuild Order Waiver submitted for drilling outside target spacing unit with no existing wellbores in adjacent unit
๐Ÿ“„ Letter from Phoenix Operating dated July 15th, 2026
Operator proactively addressing regulatory requirement for wells entering Bakken system outside spacing unit, indicating complex trajectory planning
2026-07-15 Directional Drilling
Tier 3 Permits suspended due to revocation request by Rockport Energy Solutions LLC, prohibiting all mobilization and drilling activitiesโฐ TIME-SENSITIVE
๐Ÿ“„ Letter from NDIC dated August 7, 2026
Unusual regulatory action where a third party is actively seeking to revoke permits, creating immediate operational freeze and legal uncertainty
2026-08-07 General Oilfield Services
Tier 3 NDIC engineer flags potential Federal permit requirement due to spacing unit composition, refers to BLM Dickinson officeโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated August 3, 2026
Additional federal regulatory layer identified late in permitting process, creating potential delay
2026-08-03 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk (701-590-5317) prior to location construction
๐Ÿ“„ Stipulations section, page 2
Specific inspector named with direct contact requirement, indicating heightened regulatory oversight for this pad
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Legal/Regulatory Consulting
Active permit revocation proceeding requires immediate legal response; hearing scheduled for September 2026 docket
Directional Drilling & Surveying
Complex trajectory with specific build rates (11ยฐ/100') and precise target requirements; wet shoe design indicates advanced completion planning
Waste Management & Disposal
Closed mud system with specific landfill contract; filter sock container requirement creates ongoing waste handling need
Pad Construction & Earthwork
Detailed pad design with 121,000 cu. yds. earthwork calculated; specific inspector contact required before construction