๐Ÿ›ข๏ธ SETTER FED 22-27-34 3HF

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43182 ยท Generated 2026-08-22 03:19

API
3305310859
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe with ability to frac out the toe specified in completion design
๐Ÿ“„ Completion details and schematic
Non-standard completion technique with backup hydraulic sleeve; indicates complex lateral isolation strategy
Unknown Completions / Frac
Tier 3 Permit suspended due to revocation request by Rockport Energy Solutions LLC; mobilization prohibited pending Commission hearingโฐ TIME-SENSITIVE
๐Ÿ“„ Letter from NDIC dated August 7, 2026
Unusual regulatory action halting all operations; indicates active dispute between operators over permits
2026-08-07 General Oilfield Services
Tier 3 Operator required to contact BLM regarding federal permit requirements for spacing unitโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated August 3, 2026
Additional federal regulatory layer identified after permit approval; may delay operations
2026-08-03 General Oilfield Services
Tier 3 Backbuild Order Waiver submitted for wells entering Bakken outside target spacing unit
๐Ÿ“„ Letter from Phoenix Operating dated July 15, 2026
Operator proactively addressing regulatory requirement for adjacent unit notification
2026-07-15 Regulatory / Permitting
Tier 3 Specific requirement to contact NDIC Field Inspector Doug Dolyniuk prior to location construction
๐Ÿ“„ Permit stipulations page 2
Named inspector with direct phone contact; indicates heightened oversight for this pad
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Legal/Regulatory Consulting
Active permit challenge requires immediate legal response; BLM coordination needed
Earthwork and Pad Construction
121,000 cubic yards of earthwork planned; construction cannot start until inspector notification
Specialized Completion Services
Wet shoe with frac-out capability requires specific equipment and expertise
Waste Management
Closed mud system with cuttings disposal at pre-selected landfill; filter sock container required on-site