โ† Back to Daily Permits

๐Ÿ›ข๏ธ MONKEY BARREL 14-23-26-35 1H

Phoenix Operating LLC ยท Divide County, ND ยท File #43189 ยท Generated 2026-08-22 03:20

API
3302301851
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 South setback approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Page 2 of 10, NDIC Field Order Info
Non-standard setback justification using specific completion technique (wet shoe with frac-out capability)
Unknown Completions / Frac
Tier 3 Affidavit filed notifying adjacent operator (Formentera Operations, LLC) of wellbore traversing their spacing unit per NDIC Order 31848
๐Ÿ“„ Affidavit section after aerial map
Formal regulatory compliance action for cross-unit drilling; reveals adjacent operator relationship
2026-08-06 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Marc Binns (701-770-2564) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10, Construction Commencement Notification
Specific inspector named with direct contact requirement; creates regulatory gate before pad construction
Relative General Oilfield Services
Tier 3 Operator must drill this well back-to-back with another well that complies with a 1220' setback to justify the spacing unit
๐Ÿ“„ Page 2 of 10, Conditions of Approval
Creates a drilling sequence dependency; indicates multi-well pad development with specific timing constraints
Relative General Oilfield Services
Tier 3 Drill cuttings disposal pre-selected to Smoky Butte Environmental LLC at specific address
๐Ÿ“„ Proposed Drilling Plan, Section 4
Vendor pre-selected for waste disposal; creates locked-in opportunity for specific hauler
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Earthwork and pad construction
Must contact inspector Marc Binns before construction; detailed cut/fill quantities (57,990 Cu. Yds.) and 12.335 acre pad ready for bidding
Directional drilling and surveying
Complex trajectory with nudge and build sections; specific survey requirements (100' vertical, 30' curve, 90' lateral); TACTIKAL directional planning used
Cementing and liner services
Wet shoe installation required for setback approval; detailed cement program with specific additives and volumes
Waste hauling and disposal
Closed mud system required; cuttings disposal already contracted to Smoky Butte Environmental but hauling may be open
Filter sock container management
Leak-proof container required from spud through flowback; explicit regulatory focus on filter disposal