| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
South setback reduced to 150' (vs standard 500') based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Stipulations section, Page 2 Non-standard setback approval indicates regulatory acceptance of specific completion design (wet shoe with frac-out capability) |
Unknown | Completions / Frac |
| Tier 3 |
Cores and samples must be submitted within 30 days of drilling completion (cuttings) and 180 days (cores) with potential civil penalties up to $12,500 per day violationโฐ TIME-SENSITIVE ๐ Cores and Samples letter, beginning of document Strict timeline with significant financial penalties for non-compliance |
2026-08-10 | General Oilfield Services |
| Tier 3 |
Operator required to notify adjacent unit operator (Formentera Operations, LLC) with detailed drilling and completion plans before drilling due to wellbore traversing adjacent spacing unit per NDIC Order 31848โฐ TIME-SENSITIVE ๐ Affidavit section, near end of document Reveals regulatory coordination requirement with competitor operator before drilling can commence, indicating potential for operational delays or coordination needs |
2026-08-06 | General Oilfield Services |
| Tier 3 |
Specific requirement to contact NDIC Field Inspector Marc Binns (701-770-2564) prior to location constructionโฐ TIME-SENSITIVE ๐ Stipulations section, Page 2 Direct personal contact requirement with specific inspector, not just generic notification |
Relative | General Oilfield Services |
| Tier 3 |
Explicit prohibition on using diesel-based compounds in hydraulic stimulation with specific CAS numbers listed ๐ Stimulation section, Drilling Plan Formal declaration of chemical restrictions beyond standard regulatory requirements |
Unknown | Completions / Frac |