๐Ÿ›ข๏ธ MONKEY BARREL 14-23-26-35 2H

Phoenix Operating LLC ยท Divide County, ND ยท File #43190 ยท Generated 2026-08-22 03:21

API
3302301852
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 South setback reduced to 150' (vs standard 500') based on production liner cemented in lateral with wet shoe and ability to frac out the shoe
๐Ÿ“„ Stipulations section, Page 2
Non-standard setback approval indicates regulatory acceptance of specific completion design (wet shoe with frac-out capability)
Unknown Completions / Frac
Tier 3 Cores and samples must be submitted within 30 days of drilling completion (cuttings) and 180 days (cores) with potential civil penalties up to $12,500 per day violationโฐ TIME-SENSITIVE
๐Ÿ“„ Cores and Samples letter, beginning of document
Strict timeline with significant financial penalties for non-compliance
2026-08-10 General Oilfield Services
Tier 3 Operator required to notify adjacent unit operator (Formentera Operations, LLC) with detailed drilling and completion plans before drilling due to wellbore traversing adjacent spacing unit per NDIC Order 31848โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit section, near end of document
Reveals regulatory coordination requirement with competitor operator before drilling can commence, indicating potential for operational delays or coordination needs
2026-08-06 General Oilfield Services
Tier 3 Specific requirement to contact NDIC Field Inspector Marc Binns (701-770-2564) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Stipulations section, Page 2
Direct personal contact requirement with specific inspector, not just generic notification
Relative General Oilfield Services
Tier 3 Explicit prohibition on using diesel-based compounds in hydraulic stimulation with specific CAS numbers listed
๐Ÿ“„ Stimulation section, Drilling Plan
Formal declaration of chemical restrictions beyond standard regulatory requirements
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Earthwork and Pad Construction
Detailed earthwork quantities (57,990 cu yds) and specific cut/fill requirements with 3:1 slopes; must coordinate with NDIC Field Inspector Marc Binns before starting
Waste Disposal and Environmental Services
Pre-selected disposal vendor (Smoky Butte Environmental) for cuttings; filter sock container requirement from spud through flow-back; closed mud system mandated
Directional Drilling and Surveying
Complex trajectory crossing into adjacent spacing unit requires notification to competitor operator; specific survey frequencies (100' vertical, 30' curve, 90' lateral) mandated
Cementing and Completions
Non-standard cement designs with specific additives (Type III with salt, Calseal, Econolite, Versaset, Fe-2 for surface; Class G/POZ with silicate for production); wet shoe completion technique specified