| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Production liner uses a 'wet shoe with the ability to frac out the toe' and includes specialized downhole tools (Shear Out Seat Sub, Wet Shoe Bypass Sub). ๐ Drilling Plan - Completion Program section; Casing schematic Specific completion design choice for the liner cementation and frac initiation, indicating a planned technique to stimulate the toe. |
Unknown | Completions / Frac |
| Tier 3 |
Anti-collision report shows close approaches (3.5-7 ft separation factor) with two other planned wells on the same pad (Bock 1435-5BH, Bock 1435-6BH) and an existing SWD well. ๐ KLX Anticollision Report High-density drilling on pad requires precise directional control to avoid collisions, indicating complex well planning. |
2026-07-28 | Directional Drilling |
| Tier 3 |
Operator requested and was granted a waiver of the 3-day waiting period after permit publication to commence operations, based on an affidavit of working interest.โฐ TIME-SENSITIVE ๐ Permit Information section, page 2 of 10 Indicates urgency to begin operations immediately upon permit approval, bypassing standard regulatory waiting period. |
2026-07-15 | Regulatory / Permitting |
| Tier 3 |
Well is part of a multi-well pad (Bock 14 Pad) with at least 5 future wells planned, and must be drilled 'back to back' with another well to justify the 1920-acre spacing unit. ๐ Stipulations section, page 2 of 10; Multi-well plan and pad layout diagrams Reveals a coordinated, sequential drilling campaign rather than a single well. Regulatory condition mandates immediate follow-on drilling. |
Relative | General Oilfield Services |
| Tier 3 |
Operator is submitting a sundry notice to waive open hole logs, relying instead on MWD and cased hole logs. ๐ Drilling Plan - Evaluation Program section Non-standard evaluation approach reduces traditional wireline logging scope, shifting emphasis to MWD/LWD and cased hole evaluation. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator is using produced Bakken salt water as drilling fluid for the 6" production lateral section. ๐ Drilling Plan - Drilling Fluids Program Non-standard fluid choice for the lateral; uses produced water instead of typical oil-based or slickwater systems. |
Unknown | General Oilfield Services |