South setback reduced to 150' (vs standard 500') based on production liner cemented in lateral with wet shoe and ability to frac out shoe ๐ Stipulations section, page 2 Non-standard setback approval reveals engineered completion design (cemented liner with wet shoe) allowing closer proximity to boundary. |
2026-08-07 | Completions / Frac |
| Tier 3 |
Closed mud system with no cuttings pit; cuttings to be hauled to offsite commercial facility (13 Mile Landfill, Williston, ND) ๐ Stipulations page 2 & Drilling Fluids Program Regulatory stipulation combined with explicit offsite disposal plan to specific landfill. |
2026-08-07 | Mud / Fluids |
| Tier 3 |
3-day waiting period waiver granted for pad construction based on affidavit of working interest (85.46%)โฐ TIME-SENSITIVE ๐ Permit Information section, page 2 Operator secured expedited approval to begin pad construction immediately after permit publication, bypassing standard 3-business-day waiting period. Indicates urgency to mobilize. |
2026-08-07 | Regulatory / Permitting |
| Tier 3 |
Operator plans to submit sundry to waive open hole logs ๐ Drilling Plan, Evaluation Program section Explicit intent to forego standard open hole logging, relying on MWD and cased hole evaluation only. |
Unknown | General Oilfield Services |
| Tier 3 |
Mandatory contact with specific NDIC Field Inspector (Marc Binns) prior to location construction ๐ Stipulations section, page 2 Unusual stipulation requiring direct contact with a named inspector before construction begins, not just generic notification. |
Relative | General Oilfield Services |
| Tier 3 |
Fracture stimulation planned to be pumped down 7" intermediate casing; frac string only if mechanical issues ๐ Drilling Plan, Completion Program section Design choice to use intermediate casing as frac string, deviating from more common dedicated frac string or liner completion. |
Unknown | Completions / Frac |