๐Ÿ›ข๏ธ BOCK 1435-5BH

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #43195 ยท Generated 2026-08-22 03:23

API
3302301857
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 South setback reduced to 150' (vs standard 500') based on production liner cemented in lateral with wet shoe and ability to frac out shoe
๐Ÿ“„ Stipulations section, page 2
Non-standard setback approval reveals engineered completion design (cemented liner with wet shoe) allowing closer proximity to boundary.
2026-08-07 Completions / Frac
Tier 3 Closed mud system with no cuttings pit; cuttings to be hauled to offsite commercial facility (13 Mile Landfill, Williston, ND)
๐Ÿ“„ Stipulations page 2 & Drilling Fluids Program
Regulatory stipulation combined with explicit offsite disposal plan to specific landfill.
2026-08-07 Mud / Fluids
Tier 3 3-day waiting period waiver granted for pad construction based on affidavit of working interest (85.46%)โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Information section, page 2
Operator secured expedited approval to begin pad construction immediately after permit publication, bypassing standard 3-business-day waiting period. Indicates urgency to mobilize.
2026-08-07 Regulatory / Permitting
Tier 3 Operator plans to submit sundry to waive open hole logs
๐Ÿ“„ Drilling Plan, Evaluation Program section
Explicit intent to forego standard open hole logging, relying on MWD and cased hole evaluation only.
Unknown General Oilfield Services
Tier 3 Mandatory contact with specific NDIC Field Inspector (Marc Binns) prior to location construction
๐Ÿ“„ Stipulations section, page 2
Unusual stipulation requiring direct contact with a named inspector before construction begins, not just generic notification.
Relative General Oilfield Services
Tier 3 Fracture stimulation planned to be pumped down 7" intermediate casing; frac string only if mechanical issues
๐Ÿ“„ Drilling Plan, Completion Program section
Design choice to use intermediate casing as frac string, deviating from more common dedicated frac string or liner completion.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Location Construction & Earthwork
3-day waiting period waived. Construction can begin immediately upon permit publication. Pad requires ~57,400 cu yds of fill and significant cut/fill work.
Drilling Waste Hauling & Disposal
Closed mud system mandated. Explicit plan to haul cuttings to '13 Mile Landfill, Williston, ND'. Requires contracted hauling and confirmed disposal capacity.
Cementing (Primary & Remedial)
Reduced setback approval hinges on successful cementing of production liner with wet shoe. Design includes complex cement blends (50/50 Poz, silica flour, bonding agents).
Directional Drilling / MWD
KLX Directional pre-selected. Anti-collision critical on multi-well pad. Complex trajectory with build, drop, and long lateral (~15,471 ft).