| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
South setback reduced to 150' (vs standard 500') based on production liner cemented in lateral with wet shoe and ability to frac out shoe ๐ Page 1 of 10, Stipulations section Non-standard setback approval indicates specialized completion design and regulatory negotiation |
Unknown | Completions / Frac |
| Tier 3 |
3-day waiting period waiver granted based on affidavit, allowing immediate construction/operations after permit publicationโฐ TIME-SENSITIVE ๐ Page 2 of 10, Affidavit section Operator secured regulatory exception to bypass standard 3-business-day waiting period, indicating urgency to commence pad development |
2026-07-15 | Regulatory / Permitting |
| Tier 3 |
Operator submitting sundry to waive open hole logs, relying on MWD and cased hole evaluation instead ๐ Drilling Plan, Evaluation Program section Cost-saving measure that reduces traditional wireline logging services |
Unknown | General Oilfield Services |
| Tier 3 |
Operator must drill this well back-to-back with another well to justify 1920-acre spacing unit ๐ Page 2 of 10, Stipulations section Regulatory condition ties this well's approval to simultaneous drilling of another well with specific setback requirements |
Relative | General Oilfield Services |
| Tier 3 |
Frac string will only be used if mechanical issues with 7" intermediate casing - not planned as primary completion method ๐ Drilling Plan, Completion Program section Contingency-based completion design differs from standard practice of always running frac string |
Unknown | Completions / Frac |