| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
South setback approval based on production liner cemented in lateral with wet shoe and ability to frac out the shoe ๐ Page 2 of 10, Stipulations section Non-standard completion design with wet shoe assembly; indicates planned frac-through-shoe operation |
Relative | Completions / Frac |
| Tier 3 |
Affidavit requirement for off-spacing well with executed surface use agreement ๐ Page 7 of 10, Operator Assertions Well is off-spacing, requiring additional legal documentation and surface agreements |
2026-08-10 | General Oilfield Services |
| Tier 3 |
Well requires back-to-back drilling with another well to justify spacing unit due to 1220 foot setback requirementโฐ TIME-SENSITIVE ๐ Page 2 of 10, Stipulations section Creates immediate follow-on drilling opportunity; operator must drill another well in sequence to comply with spacing approval |
Relative | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Jason Hicks (701-720-3523) prior to location constructionโฐ TIME-SENSITIVE ๐ Page 2 of 10, Conditions of Approval Specific inspector named with direct contact requirement; indicates heightened regulatory oversight |
Relative | General Oilfield Services |
| Tier 3 |
Directional plan shows wellbore enters Bakken Pool at 118' FSL & 575' FWL in different section than surface location ๐ Directional Plan Overview section Well traverses multiple sections before entering target formation, indicating complex trajectory |
Unknown | Directional Drilling |