๐Ÿ›ข๏ธ KANDIYOHI 159-90-4-21H-2

HUNT OIL COMPANY ยท Burke County, ND ยท File #43198 ยท Generated 2026-08-22 03:24

API
3301302083
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval conditional on a 150 ft south setback based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe
๐Ÿ“„ STIPULATIONS - NDIC Field Order Info
Specifies a unique well construction and completion method (cemented liner with wet shoe) as the basis for a reduced regulatory setback. This is a design-driven exception to standard spacing rules.
2026-08-10 Completions / Frac
Tier 3 Cores and samples must be submitted to state library within 30 days (samples) and 180 days (cores) of drilling completion, with extensions requiring Form 4 Sundry Notice approvalโฐ TIME-SENSITIVE
๐Ÿ“„ Letter dated 8/17/2026
Imposes strict, short-term deadlines for sample submission post-drilling, with a formal process for extensions. This is a binding post-operational requirement with penalty risks.
2026-08-17 Drilling Rigs
Tier 3 Wellbore enters Bakken Pool outside target spacing unit, requiring formal notification and plan sharing with offset operator LimeRock per NDIC Order 31973
๐Ÿ“„ Affidavit of Chelsea Cherry, Anticollision Report
Reveals a non-standard wellbore trajectory crossing into an adjacent unit, triggering specific regulatory obligations and inter-operator coordination not typical for a standard development well.
2026-08-10 Drilling Rigs
Tier 3 Operator must maintain a leak-proof, covered, placarded container for filter sock disposal on-site from spud through flowback, with waiver requiring a Sundry Notice
๐Ÿ“„ Operator assertions, July 29, 2026 letter
Highlights an explicit, ongoing waste management requirement with a defined container specification and a formal waiver process. Emphasizes regulatory focus on filter media disposal.
2026-07-29 Regulatory / Permitting
Tier 3 Mandatory pre-construction contact with NDIC Field Inspector Jason Hicks (701-720-3523) prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ STIPULATIONS - Construction Commencement Notification
Names a specific field inspector for mandatory pre-construction contact, creating a direct regulatory touchpoint. This is more specific than generic notification requirements.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD Services
Scientific Drilling is already engaged in planning. The anti-collision report shows tight spacing with other planned wells on the pad (H-1, H-3), requiring high-precision execution. The wellbore also traverses into an adjacent unit, increasing complexity.
Liner Hanger & Cementing Services
The approved well design and setback are contingent on a 'production liner cemented in the lateral with a wet shoe.' This specifies the need for a liner hanger system, specialized cementing for the lateral, and a wet shoe assembly, creating a near-term opportunity post-intermediate casing.
Environmental & Waste Management
Explicit, ongoing requirement for a specific filter sock container from spud through flowback. Closed mud system and cuttings hauling to approved facility are stipulated. This creates a continuous need for waste handling, transportation, and disposal services.
Civil Construction & Pad Building
Pad design by KLJ is complete. Construction cannot commence until direct contact is made with NDIC Inspector Jason Hicks. This creates an immediate pre-construction gate. Detailed cut/fill volumes and pad specifications are provided, enabling precise bidding.
Geological Sample Management
Strict 30-day deadline post-drilling for sample submission to the state library. Requires washing, drying, packaging, and shipping services immediately after rig departure, creating a short-fuse, deadline-driven contract opportunity.