| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit approval conditional on 150' north, 50' south, and 1220' east/west setbacks within a 1920-acre spacing unit, with south setback based on a fully cemented production liner shoe that cannot be fraced out. ๐ STIPULATIONS section, first page Unusually restrictive and asymmetric setback requirements tied to specific wellbore construction (cemented liner shoe) that eliminates frac-out capability, indicating heightened regulatory or geological sensitivity. |
Unknown | Completions / Frac |
| Tier 3 |
BLM notification required for federal minerals within spacing unit; operator directed to contact BLM Dickinson office at (701) 227-7713.โฐ TIME-SENSITIVE ๐ Email from Doug Jackson to Sergio Villa dated 8/17/2026 Permit approval triggers additional federal oversight requirement, indicating overlapping state/federal jurisdiction. |
2026-08-17 | Drilling Rigs |
| Tier 3 |
Drill cuttings disposal explicitly designated to Ideal Oilfield Disposal or IHD Solid Management disposal facility. ๐ Letter to Daniel Kuchar regarding Drill Cuttings Disposal Operator pre-selects two specific waste disposal vendors, indicating established contracts or regional preferences. |
2026-07-29 | General Oilfield Services |
| Tier 3 |
H2S drilling operations plan prepared by Total Safety Inc., with safety equipment trailer and detailed H2S monitoring/procedures required 500' above or 3 days prior to penetrating first H2S zone. ๐ H2S DRILLING OPERATIONS PLAN sections Explicit, vendor-specific H2S safety plan with detailed equipment list and procedures indicates anticipated H2S presence and pre-selected safety contractor. |
Relative | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction.โฐ TIME-SENSITIVE ๐ STIPULATIONS section, first page Pre-construction contact requirement with a named inspector suggests site-specific oversight or environmental/land-use sensitivities. |
Relative | General Oilfield Services |
| Tier 3 |
Production liner will use a Halliburton RapidStart Initiator Sleeve and be fully cemented with no ability to frac out the shoe. ๐ Completion & Perforation section, schematic notes Specifies a Halliburton proprietary completion tool and a cemented liner design that eliminates shoe fracturing, indicating a specific completion strategy. |
Unknown | Completions / Frac |