๐Ÿ›ข๏ธ Superior Federal 31-32 32-8 TF3H

TRUE OIL LLC ยท McKenzie County, ND ยท File #43216 ยท Generated 2026-08-25 04:31

API
3305310870
Target Formation
Three Forks
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Permit approval conditional on 150' north, 50' south, and 1220' east/west setbacks within a 1920-acre spacing unit, with south setback based on a fully cemented production liner shoe that cannot be fraced out.
๐Ÿ“„ STIPULATIONS section, first page
Unusually restrictive and asymmetric setback requirements tied to specific wellbore construction (cemented liner shoe) that eliminates frac-out capability, indicating heightened regulatory or geological sensitivity.
Unknown Completions / Frac
Tier 3 BLM notification required for federal minerals within spacing unit; operator directed to contact BLM Dickinson office at (701) 227-7713.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Doug Jackson to Sergio Villa dated 8/17/2026
Permit approval triggers additional federal oversight requirement, indicating overlapping state/federal jurisdiction.
2026-08-17 Drilling Rigs
Tier 3 Drill cuttings disposal explicitly designated to Ideal Oilfield Disposal or IHD Solid Management disposal facility.
๐Ÿ“„ Letter to Daniel Kuchar regarding Drill Cuttings Disposal
Operator pre-selects two specific waste disposal vendors, indicating established contracts or regional preferences.
2026-07-29 General Oilfield Services
Tier 3 H2S drilling operations plan prepared by Total Safety Inc., with safety equipment trailer and detailed H2S monitoring/procedures required 500' above or 3 days prior to penetrating first H2S zone.
๐Ÿ“„ H2S DRILLING OPERATIONS PLAN sections
Explicit, vendor-specific H2S safety plan with detailed equipment list and procedures indicates anticipated H2S presence and pre-selected safety contractor.
Relative General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ STIPULATIONS section, first page
Pre-construction contact requirement with a named inspector suggests site-specific oversight or environmental/land-use sensitivities.
Relative General Oilfield Services
Tier 3 Production liner will use a Halliburton RapidStart Initiator Sleeve and be fully cemented with no ability to frac out the shoe.
๐Ÿ“„ Completion & Perforation section, schematic notes
Specifies a Halliburton proprietary completion tool and a cemented liner design that eliminates shoe fracturing, indicating a specific completion strategy.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

H2S Safety & Monitoring
Total Safety Inc. is explicitly contracted; equipment must be installed 500' above or 3 days prior to penetrating H2S zone. Immediate mobilization opportunity for safety services and equipment rental.
Drill Cuttings & Waste Disposal
Operator has designated Ideal Oilfield Disposal and IHD Solid Management; closed mud system with no cuttings pit requires ongoing hauling and disposal. Opportunity for waste transport and disposal services is locked to these two vendors unless changes occur.
Directional Drilling & MWD
Complex directional plan with kick-off at 10,165' MD, building to horizontal, and a long lateral (~15,430'); plan references MWD+HRGM survey tool. High-precision directional services needed soon after spud.
Cementing & Centralization
Detailed cementing programs with excess percentages and specific centralizer schedules (e.g., one centralizer per joint in lateral). Cementing services and centralizer supply required for surface, intermediate, and production casing runs.
Completion Tools & Stimulation
Halliburton RapidStart Initiator Sleeve specified; well will be completed with ~45 stages, 6-7 clusters per stage. Completion and stimulation services likely to be awarded to Halliburton or involve their tools.