๐Ÿ›ข๏ธ AKEMI FERRARI 14-11-2 1H-LLR

Phoenix Operating LLC ยท Divide County, ND ยท File #43217 ยท Generated 2026-08-25 04:31

API
3302301859
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Backbuild Order Waiver (NDIC Order 31848) submitted because well trajectory enters Bakken outside target spacing unit, but operator owns adjacent unit.
๐Ÿ“„ Letter to Todd Holweger dated August 13, 2026
Reveals a complex unit boundary crossing that required a regulatory waiver process, now resolved.
2026-08-13 Directional Drilling
Tier 2 Use of a 'wet shoe' in production liner with ability to frac out the shoe, tied to a north setback condition.
๐Ÿ“„ Stipulations (NDIC Field Order Info), Schematic notes
Non-standard completion design driven by regulatory setback requirement. Implies a specific frac sequence starting at the shoe.
Unknown Completions / Frac
Tier 3 Operator requested waiver of 3-day waiting period post-permit publication, citing pad already constructed and rig on site.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit of Working Interest
Indicates immediate operational readiness and urgency to spud, bypassing standard regulatory waiting period.
2026-08-14 Directional Drilling
Tier 3 Stipulation requires drilling one well in a 1920-acre 'standup' unit before completing any well in the larger 3840-acre unit.
๐Ÿ“„ Page 2 of 10, Stipulations
Creates a phased development sequence, locking in a completion order. The first well must be drilled AND completed before any work on others in the pad.
Relative Completions / Frac
Tier 3 Specific disposal vendor named: Smoky Butte Environmental, LLC for drill cuttings.
๐Ÿ“„ Disposal of Drill Cuttings section
Explicitly pre-selected waste disposal contractor, locking out competitors for this scope.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Rig Services
Rig is reported on site; spud is imminent upon permit approval and waiver grant. Pressure to commence immediately.
Directional Drilling & MWD
Complex trajectory crossing unit boundaries; Taktikal Directional already designed plan. Services needed for precise execution to meet regulatory stipulations.
Waste Hauling & Disposal
Smoky Butte Environmental is named disposal facility; hauling contracts need to be activated as soon as drilling starts (closed loop system).
Cementing & Completions
Specific cement design for wet shoe and liner; frac-out operation at shoe required. Cementing and stimulation planning must align with this non-standard design.