| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Backbuild Order Waiver (NDIC Order 31848) submitted because well trajectory enters Bakken outside target spacing unit, but operator owns adjacent unit. ๐ Letter to Todd Holweger dated August 13, 2026 Reveals a complex unit boundary crossing that required a regulatory waiver process, now resolved. |
2026-08-13 | Directional Drilling |
| Tier 2 |
Use of a 'wet shoe' in production liner with ability to frac out the shoe, tied to a north setback condition. ๐ Stipulations (NDIC Field Order Info), Schematic notes Non-standard completion design driven by regulatory setback requirement. Implies a specific frac sequence starting at the shoe. |
Unknown | Completions / Frac |
| Tier 3 |
Operator requested waiver of 3-day waiting period post-permit publication, citing pad already constructed and rig on site.โฐ TIME-SENSITIVE ๐ Affidavit of Working Interest Indicates immediate operational readiness and urgency to spud, bypassing standard regulatory waiting period. |
2026-08-14 | Directional Drilling |
| Tier 3 |
Stipulation requires drilling one well in a 1920-acre 'standup' unit before completing any well in the larger 3840-acre unit. ๐ Page 2 of 10, Stipulations Creates a phased development sequence, locking in a completion order. The first well must be drilled AND completed before any work on others in the pad. |
Relative | Completions / Frac |
| Tier 3 |
Specific disposal vendor named: Smoky Butte Environmental, LLC for drill cuttings. ๐ Disposal of Drill Cuttings section Explicitly pre-selected waste disposal contractor, locking out competitors for this scope. |
Unknown | General Oilfield Services |