| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 1 |
Waiver granted for tubing/packer requirement based on casing specifications and completion design assurances. ๐ Sundry Form ID 333657, DESCRIPTION (OPERATOR) Non-standard completion design variance, relying on casing burst rating and monitoring instead of a packer. |
2026-08-26 | Regulatory / Permitting |
| Tier 3 |
Operator must provide monthly conventional rig updates to the DMR and call inspectors at specific operational milestones.โฐ TIME-SENSITIVE ๐ Sundry Form ID 342054, REVIEWER COMMENTS Enhanced regulatory reporting and inspection requirements tied to the two-rig drilling plan. |
2026-10-23 | Drilling Rigs |
| Tier 3 |
Operator plans a two-rig sequence: a small rig to drill surface hole and set casing, then a larger rotary rig to drill to TD within 90 days.โฐ TIME-SENSITIVE ๐ Sundry Form ID 342054, DESCRIPTION (OPERATOR) Unusual operational plan to achieve cost and time savings, creating two distinct rig mobilization/demobilization events. |
2026-10-13 | Drilling Rigs |
| Tier 3 |
Regulatory approval for a pilot project waiving onsite mud logging, using off-site sample collection by rig personnel. ๐ Sundry Form ID 333669, DESCRIPTION (OPERATOR) and attached SOP Regulatory waiver for a non-standard mud logging procedure, shifting sample collection responsibility to rig crew. |
2026-08-26 | Mud / Fluids |
| Tier 3 |
Waiver for drill cutting sample collection in vertical section, using samples from an offset well on the same pad. ๐ Sundry Form ID 333664, DESCRIPTION (OPERATOR) Regulatory allowance to skip vertical sampling, relying on pad-level sampling strategy. |
2026-08-26 | Regulatory / Permitting |