| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Conditional approval based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe ๐ Page 1 of 10 (Stipulations) Specific, non-standard cementing and completion design is a condition of the permit, dictating well construction methodology. |
Unknown | Completions / Frac |
| Tier 3 |
Rig contract signed with H&P #515 for estimated spud date 9/10/2026โฐ TIME-SENSITIVE ๐ Page 7 of 10 Operator has pre-selected a specific drilling rig contractor, indicating firm operational planning and a near-term start date. |
2026-09-10 | Drilling Rigs |
| Tier 3 |
Explicit requirement to contact NDIC Field Inspector Doug Dolyniuk prior to commencing operations ๐ Page 2 of 10 A specific inspector is named for pre-spud notification, indicating heightened regulatory oversight or site-specific conditions. |
Relative | General Oilfield Services |
| Tier 3 |
Well is a proposed redrill on an existing multi-well pad ๐ Page 7 of 10 Indicates development of a mature pad with existing infrastructure and potential for simultaneous operations or pad optimization services. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator asserts the well will not be stimulated ๐ Drilling Prognosis section Departure from standard Bakken completion practice; indicates an open-hole completion plan without hydraulic fracturing. |
Unknown | Completions / Frac |