๐Ÿ›ข๏ธ Chang 4595 42-19 6B

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #43293 ยท Generated 2026-09-17 03:48

API
3302505245
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Explicit 'wet shoe' liner design specified for cost-effective toe initiation, deviating from standard cemented liner.
๐Ÿ“„ Attachment/Drilling & Proposed Work Statements, Wet Shoe section
A deliberate engineering choice that alters the standard cementing program and completion workflow, creating a specific service niche.
2026-08-11 Completions / Frac
Tier 3 Mandatory pre-construction contact with a named NDIC Field Inspector (Doug Dolyniuk).โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations, Page 1
A personal, named regulatory contact is a condition of approval, creating a specific procedural step before work begins.
2026-09-09 General Oilfield Services
Tier 3 Operator formally requests waiver from adjacent operator notification rule because it operates the adjacent unit itself.
๐Ÿ“„ Waiver request letter
Demonstrates strategic use of asset concentration to reduce administrative delay, signaling coordinated pad development.
2026-09-02 Regulatory / Permitting
Tier 3 Operator declares a specific anti-collision protocol including a 1.2 safety factor, real-time corrected surveys, and gamma ray correlation.
๐Ÿ“„ Anti-Collision Statement
Goes beyond basic anti-collision statements by specifying the safety factor and technologies used, indicating a high-risk environment and a reliance on specific service capabilities.
2026-08-11 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / Surveying / Anti-Collision Services
The anti-collision statement and detailed plan indicate high risk in a dense well environment, requiring sophisticated real-time monitoring and survey services. The plan is approved and drilling is imminent (Anticipated Commencement Date: Jun 07, 2025).
Cementing & Completion Services
The explicit 'wet shoe' design requires precise cement over-displacement and creates a specific completion operation for toe initiation. This is a non-standard procedure tied to the approved well design.
Drill Cuttings Disposal
Operator has pre-selected a list of licensed disposal facilities, indicating hauling and disposal contracts will be awarded based on proximity. The list is current and part of the permit.
Pad Construction & Earthwork
The permit includes detailed construction plans, earthwork quantities, and a new pad construction statement. The mandatory inspector contact must occur prior to construction, indicating imminent ground-breaking.