| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditioned on wellbore being no closer than 150' setback from north & south boundaries within the 5120-acre unit, with south setback based on a cemented production liner with a wet shoe. ๐ Permit Information / Conditions of Approval Specific geosteering and completion design constraint (wet shoe) mandated by the regulator to manage boundary setbacks. |
Unknown | Directional Drilling |
| Tier 3 |
Operator plans to request a waiver for open-hole logging requirements, citing a previously-logged offset well (NDIC# 8139) for geologic control. ๐ Preliminary Drilling Program Non-standard approach to regulatory logging mandates, relying on offset data instead of in-well logs. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Jason Hicks prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Review Policy Explicitly names the field inspector and creates a mandatory pre-construction contact point. |
Relative | General Oilfield Services |
| Tier 3 |
Operator plans to request a waiver for the filter sock container requirement, stating filtration systems will not be used. ๐ Preliminary Drilling Program Indicates a deviation from standard regulatory waste handling practices and a planned administrative action (sundry filing). |
Unknown | Regulatory / Permitting |
| Tier 3 |
Drilling stipulation requires one horizontal well be drilled and completed in two 2560-acre units before any well is completed in the combined 5120-acre unit. ๐ Permit Information / Stipulations Imposes a specific sequence of operations that dictates drilling and completion timing for multiple wells on the pad. |
Unknown | General Oilfield Services |