| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Production liner cemented in lateral with a wet shoe and ability to frac out the shoe. ๐ Page 1 of 10 Specifies a non-standard completion design (cemented liner with wet shoe) intended for toe stimulation, indicating a specific operational intent. |
2026-09-16 | Completions / Frac |
| Tier 3 |
Approval conditional on drilling a companion well to justify the 1920-acre spacing unit. ๐ Page 2 of 10 Permit approval is not standalone; it mandates drilling a second well with specific setbacks, creating a multi-well commitment and sequencing dependency. |
2026-09-16 | Directional Drilling |
| Tier 3 |
Long-term erosion monitoring plan required prior to spudding. ๐ Page 1 of 10 Adds a non-routine environmental planning and monitoring obligation that must be fulfilled before drilling can begin. |
Relative | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE ๐ Page 1 of 10 A specific, named inspector is assigned with a pre-construction contact requirement, indicating heightened regulatory oversight and a procedural gate before pad build. |
Relative | General Oilfield Services |