| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 1 |
Pre-selected cuttings disposal vendor (Dishon Disposal) and detailed cementing program with a wet shoe completion design are specified. ๐ Proposed Drilling Plan / Disposal of Drill Cuttings Explicitly names a waste disposal contractor and outlines a non-standard liner cementing program with a frac-out capability. |
Unknown | Completions / Frac |
| Tier 3 |
Operator filed an affidavit confirming notification to Oasis Petroleum (Chord Energy) of proposed wellbores entering adjacent spacing unit, as required by Order 31848. ๐ Affidavit of Notification (attached) Demonstrates active regulatory compliance with inter-operator notification rules and identifies a specific neighboring operator. |
2026-05-05 | General Oilfield Services |
| Tier 3 |
Operator must contact a specific NDIC Field Inspector (Jessica Gilkey) by phone prior to location construction, indicating heightened regulatory oversight or site-specific conditions.โฐ TIME-SENSITIVE ๐ Permit Stipulations / Construction Commencement Notification Directs pre-construction engagement with a named inspector, deviating from generic notification procedures. |
Relative | General Oilfield Services |
| Tier 3 |
Well must be drilled in conjunction with another well to justify the 1920-acre spacing unit, indicating a multi-well pad development plan. ๐ Stipulations / NDIC Field Order Info Permit approval is conditional on concurrent drilling of another well, revealing operator's pad development strategy. |
Relative | General Oilfield Services |