๐Ÿ›ข๏ธ AMBER 1704-7BH

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #43310 ยท Generated 2026-09-18 04:38

API
3302301877
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Well location on an aquifer triggers mandatory NDIC Field Inspector site inspection and likely requires a closed mud system with impermeable liner.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, 'SPECIAL ATTENTION' stipulation
This is a non-routine, location-specific regulatory condition that imposes additional design constraints and requires direct regulatory coordination before construction.
2026-09-17 Mud / Fluids
Tier 3 Operator specifies a closed-loop drilling system and that 'All drill cuttings will be disposed at 13 Mile Landfill, Williston, ND.'
๐Ÿ“„ Drilling Plan, 'Drilling Fluids Program' note
Pre-selection of a specific, distant disposal facility defines waste logistics and eliminates competitive bidding for cuttings hauling and disposal for this well.
2026-08-14 Mud / Fluids
Tier 3 Operator declares intent to submit a sundry notice to waive open hole logs.
๐Ÿ“„ Drilling Plan, 'Evaluation Program' section
Explicit statement of intent to forego a routine service (open-hole logging) post-approval, which may require alternative evaluation methods.
2026-08-14 Regulatory / Permitting
Tier 3 Anti-collision report shows very close planned approaches (e.g., 3.7 ft separation factor) to other wells on the same pad (Amber 1705-6BH).
๐Ÿ“„ KLX Anticollision Report summary table
Extremely tight wellbore spacing necessitates precise directional drilling and underscores the operational sequencing and interdependence of pad wells.
2026-08-14 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental & Site Construction Services
The 'aquifer' stipulation requires immediate coordination with the NDIC Field Inspector and likely installation of impermeable liners and closed-loop systems before pad construction can start.
Directional Drilling / MWD
The anti-collision report shows extremely tight spacing with other wells; precise wellbore placement is critical. The drilling plan also explicitly names KLX Directional as the MWD contractor.
Waste Hauling & Disposal
Operator has pre-selected '13 Mile Landfill, Williston, ND' for all drill cuttings, creating a locked-in opportunity for hauling and disposal services.
Civil Earthwork & Pad Construction
Detailed pad layout and earthwork quantities (57,190 cu yds cut) are specified, with construction notification required to inspector Marc Binns prior to commencement.