| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes a specific condition for a cemented production liner with a wet shoe in the lateral, allowing the shoe to be fracked out, modifying the north setback to 150'. ๐ Page 1 of 10, Stipulation section This is a non-standard completion design choice (cemented liner with wet shoe) that directly influences the approved wellbore placement and completion methodology, deviating from a standard plug-and-perf or sliding sleeve approach. |
Unknown | Completions / Frac |
| Tier 3 |
A waiver request for adjacent unit notification requirements (Order 31973) was submitted because Hess is the operator of both the drilling unit and the adjacent unit the wellbore traverses. ๐ Letter from Levi S. Greenly to NDIC, dated July 8, 2026 Highlights a regulatory nuance where intra-operator drilling simplifies permitting. It also explicitly lists GO-Binde-158-98-3514H-1 as another well planned from the same pad, confirming multi-well pad development. |
2026-07-08 | Regulatory / Permitting |
| Tier 3 |
Operator submitted an affidavit (June 17, 2026) confirming a Surface Use Agreement is in place with landowners Norman and Lisa Hanson, specifically for drilling 'off lease' (off-spacing) wells from this pad location. ๐ Affidavit section, following the well location plat The affidavit is a recent, time-stamped legal document that confirms surface access is secured not just for this well, but for drilling multiple 'off lease' wells from this pad into specific adjacent sections, revealing planned future activity. |
2026-06-17 | General Oilfield Services |
| Tier 3 |
The approved permit includes a condition requiring a 'closed mud system with no cuttings pit' and that cuttings will be hauled to a state-approved facility. ๐ Page 1 of 10, Conditions of Approval This is a non-standard waste handling requirement that eliminates a standard on-site cuttings pit, mandating off-site hauling and disposal. |
Unknown | Mud / Fluids |
| Tier 3 |
The drilling prognosis specifies the use of Oil Base Mud (OBM) from 2,185 ft to 11,483 ft MD, and Salt Water mud from 11,483 ft to TD. ๐ Drilling Prognosis section, MUD PROGRAM table Specifies a non-aqueous fluid (OBM) for the long intermediate section, which is a higher-cost, performance-based fluid system choice compared to water-based mud. |
Unknown | Mud / Fluids |