| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Well pad is located on an aquifer, triggering mandatory NDIC inspection and site-specific stipulations including a closed mud system with no pit and an impermeable liner.โฐ TIME-SENSITIVE ๐ Page 1, Stipulations section This is a high-compliance location requiring specialized environmental safeguards before construction can begin, differing from standard pad requirements. |
2026-09-21 | Mud / Fluids |
| Tier 3 |
MWD Contractor KLX Directional is explicitly named in the approved drilling plan dated August 21, 2026. ๐ Drilling Plan, Section 1: Estimated Formation Tops The vendor is pre-selected and documented in the official plan, indicating a locked-in contract ahead of spud. |
2026-08-21 | Directional Drilling |
| Tier 3 |
All drill cuttings will be disposed at 13 Mile Landfill, Williston, ND, as per the approved drilling plan. ๐ Drilling Plan, Section 4: Drilling Fluids Program Identifies a pre-arranged waste disposal endpoint, which is a specific commercial opportunity not evident from permit data alone. |
2026-08-21 | General Oilfield Services |
| Tier 3 |
Operator plans to submit a sundry notice to waive open hole logs, opting for a cased-hole evaluation program instead. ๐ Evaluation Program section This is a non-standard approach that changes the logging vendor opportunity from open-hole to cased-hole services. |
Relative | General Oilfield Services |